(12-21-2018, 02:05 AM)jeffster Wrote: [ -> ]So I gather they expect the bulk of the work to be completed within 1 1/2 years. Nice.

Once they get to the interior (which will still take a while) they probably can open up the road to normal capacity.
Ya at that point I can't see any reason to have more than a couple single day closures.
Being 39 floors now, anyone have an official # of units count? How many units per floor?
(12-21-2018, 10:38 AM)Momo26 Wrote: [ -> ]Being 39 floors now, anyone have an official # of units count? How many units per floor?

I recall the articles at the time the original 33 story building was announced, mentioned 410 total units. Seems the web page is not accessible at the moment. The previous numbers equate to an average of over 12 units per floor. Based on that, I would guesstimate the 39 story version to be near 500 units.
(12-20-2018, 10:54 AM)Ace Wrote: [ -> ]Sorry! The remainder is all you. It's a shame we can't make this a collaborative project with Earth. 

I believe you can use SketchUp together with Google Earth to do this sort of site modelling.

Edit: Hmm, seems that feature may have been moved to the commercial version of SketchUp after Google sold it.
Anyone know if any work is being done at this site? Hopefully some digging soon and another large crane!
The hoardings are now completed, and the Duke sidewalk has fully reopened. They've still closed Frederick temporarily, I think to make sure that the vehicular entrance there still works smoothly.
I would think it will be a while before we see a crane. A lot of shoring and caisson wall before excavation can even begin. I am guessing summer time for a crane at the earliest. This will likely be a deep hole like Charlie West..
(01-03-2019, 08:03 AM)Rainrider22 Wrote: [ -> ]I would think it will be a while before we see a crane.  A lot of shoring and caisson wall before excavation can even begin.  I am guessing summer time for a crane at the earliest.  This will likely be a deep hole like Charlie West..

I think the crane will go up much sooner.  DTK has a permit for 39 floors + 1 below grade so there would be no reason for a really deep hole.  But I'm not an engineer..... 
(01-03-2019, 09:15 AM)jgsz Wrote: [ -> ]
(01-03-2019, 08:03 AM)Rainrider22 Wrote: [ -> ]I would think it will be a while before we see a crane.  A lot of shoring and caisson wall before excavation can even begin.  I am guessing summer time for a crane at the earliest.  This will likely be a deep hole like Charlie West..

I think the crane will go up much sooner.  DTK has a permit for 39 floors + 1 below grade so there would be no reason for a really deep hole.  But I'm not an engineer..... 

I predict June 3rd, the same day ION starts. Which will be interesting because they will have to close the tracks for LTR at Duke for the erection of the crane !!
I predict that nothing will happen until the building permit is issued!
(01-03-2019, 12:00 PM)rangersfan Wrote: [ -> ]I predict that nothing will happen until the building permit is issued!

Okay but that’s beside the point!
Quote:they will have to close the tracks for LTR at Duke for the erection of the crane !!
Good one, but all future road closures will naturally be on the Frederick side.
Permits. Blah big deal! hah

With the amount of above ground parking they've got, there shouldn't be much digging. Hope it starts soon.
Sorry if I forgot or missed it, when is the crane expected to be up on this project?