Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - numberguy - 04-12-2015

(04-10-2015, 01:20 PM)DHLawrence Wrote: Which division is the closest to being a moneymaker, aviation or rail?

Rail, by far.   The recent delays of its C series jet have cost Bombardier billions of dollars.   It's a big gamble, stepping up in plane size and going up against the big boys like Boeing etc.   To make money, you have to spend money and revenues from a SUCCESSFUL C series launch would be huge.

But that hasn't happened yet.   So Bombardier is investigating a possible spin-off or partial sale of its rail unit to give it time for its C series launch to happen (no pun intended):  http://business.financialpost.com/news/transportation/bombardier-inc-explores-sale-or-ipo-of-rail-business-as-aircraft-unit-falters-sources


RE: ION - Waterloo Region's Light Rail Transit - ookpik - 04-12-2015

(04-10-2015, 01:03 PM)BuildingScout Wrote: Bombardier last turned a real profit many decades ago. Ever since then they have survived through government handouts. Their modus operandi is to threaten to close a large plant, get the union to stand behind them and apply political pressure when bidding for a local contract. Nationalist voices then step in and provide further support. Wash, rinse and repeat.

How are Airbus and Embraer any different? And Boeing gets lots of subsidies from Uncle Sam by way of military spending. See for example: Competition between Airbus and Boeing and Bombardier Aerospace and Embraer S.A. government subsidy controversy

Even the "principled" Mr Harper, who as opposition leader spared no effort to air his conservative views by railing against subsidies to Bombardier, had to get on board the gravy train once he finally got into the first class seats in Parliament, proving once again that pigs can indeed fly high. (Sorry for the puns.)


RE: ION - Waterloo Region's Light Rail Transit - Canard - 04-12-2015



A bit concerning, for several reasons;

-The geometry of the trains used on G:link are the same as ours (except theirs are 7-section trains, not 5). To be clearer: our trains have wheels which are fixed rigidly to the frames of the odd-numbered modules, not on bogies which swivel like Toronto's CLRV and ALRV's. The fixed wheel arrangement makes it possible to have 100% low floor, and results in a lighter vehicle with a lower cost, but the disadvantage is that the entire mass of the module sitting on those wheels has to be steered by the flanges. I'm worried about the number of sharp turns our system has. Ottawa chose Alstom CITADIS trains which have articulated bogies.

-G:link was built by many of the same players as our system.

-A resolution was found by using special lubricants to mitigate some of the squeal in some sections. I hope this information is passed along to us.

I'm just going to put it out there one last time and bookmark this post to bring it up in 2-3 years Smile that Monorail or other rubber-tyred systems (VAL/CityVal, Kobelco AGT, INNOVIA APM, Crystal Mover, or heck - even TransLohr etc...) would have none of these problems. Their own other issues, sure, like the resistance to overhead guideway, but if you really wanted LRT over any of the other possibilities of newer transit technologies, this is the price.

I really don't want this to sound like doom and gloom, but just that I hope proper plans are in place to work the noise problem when it comes up.

(I'm happy to further the discussion about articulation/bogies/chassis design, if there's interest - I've actually been meaning to put together an animation about this for a while)


RE: ION - Waterloo Region's Light Rail Transit - Canard - 04-12-2015

That's a good video, and yes, the Straßenbahn Berlin uses fixed-axle Flexity trams.  Although the alignment there is mostly long, straight runs with very gentle curves.  The photo below shows off the axle location relative to the sections:

[Image: 4001_2011_02.jpg]

I only mentioned it in the above post because I've read on other forums that the TTC operators aren't happy that they've had to cut their speed in several sections of the 510 route (where they're rolling out the Outlooks) as a result of the lack of articulated bogies like the CLRV and ALRV's have.  The turnaround at Union was a struggle even for those.

Again, I hope it's a non-issue, but that solutions will be ready to put into place if it becomes one.  I'm not knocking on the vehicle choice, at all (the trains we got were my 1st choice, given the option) - if I were designing an articulated light rail vehicle from scratch, I would have ended up with the same design.

Edit - Note the lack of fences in your video, too! Wink


RE: ION - Waterloo Region's Light Rail Transit - Canard - 04-12-2015

It happens everywhere LRT is installed. Just look on YouTube. Houston takes the record with an average of 6 crashes per month.


RE: ION - Waterloo Region's Light Rail Transit - ookpik - 04-12-2015

Zürich, with a population similar to K-W, has had a light rail (tram) system for well over a century. They run Bombardier trains including Flexity as well as other low-floor designs.

One of the most heavily-used lines runs down the main shopping street, Bahnhofstraße from the main train station, Hauptbahnhof, to a large square, Paradeplatz. There are at least half a dozen lines that run through both of those areas in several directions. Pedestrians cross those lines mostly without the need for barriers or traffic lights. 

And yet note...
• the number of pedestrians. 
• the lack of barriers. 
• the lack of pedestrians in the path of the trams. 
(• the guy in the second photo is crossing Paradeplatz behind the train.)

[Image: 250px-Bahnhofstrasse_-_Uraniastrasse_-_B...ShiftN.jpg][Image: 220px-Z%C3%BCrich_Paradeplatz.jpg][Image: 220px-Tango_als_Tram_in_Z%C3%BCrich_beim...eplatz.jpg]


RE: ION - Waterloo Region's Light Rail Transit - Canard - 04-12-2015

Well, maybe we need another night in front of Council with a number of delegations pointing this all out? Did anyone hear back from any of the council members they emailed? I didn't...


RE: ION - Waterloo Region's Light Rail Transit - jamincan - 04-14-2015

I just drove by the corner of Erb/Bridgeport/Father Dave Bauer, and it looks like they have some sort of track laying equipment staged there and a railcar with a bunch of short rail sections. I don't really know much about these things, but could they be close to placing track already north of there?


RE: ION - Waterloo Region's Light Rail Transit - BuildingScout - 04-14-2015

(04-14-2015, 12:06 PM)jamincan Wrote: I just drove by the corner of Erb/Bridgeport/Father Dave Bauer, and it looks like they have some sort of track laying equipment staged there and a railcar with a bunch of short rail sections. I don't really know much about these things, but could they be close to placing track already north of there?

They park their track laying equipment there. Usually goes up North in the morning to lay track near the rail yard and comes back at the end of the day. It could just be that they are not laying track today so they left the equipment there.


RE: ION - Waterloo Region's Light Rail Transit - panamaniac - 04-14-2015

Does anyone know if the design of the ion stations has been finalized? I've seen some (rather modest) concept drawings, but I don't know if that's the actual design.


RE: ION - Waterloo Region's Light Rail Transit - Canard - 04-14-2015

I too would love to see some final design drawings. I think we can assume they will be almost identical to the aBRT stops being finished off right now in Cambridge.


RE: ION - Waterloo Region's Light Rail Transit - YKF - 04-14-2015

(04-14-2015, 06:00 PM)Canard Wrote: I too would love to see some final design drawings. I think we can assume they will be almost identical to the aBRT stops being finished off right now in Cambridge.

That would be somewhat depressing... I was hoping we'd draw a bit of inspiration from Calgary's stations (minus the high platforms). Money talks though and we know we're getting a fairly bare bones system when it comes to stations.
[Image: 005-album-0008.jpg]


RE: ION - Waterloo Region's Light Rail Transit - Drake - 04-14-2015

Here is a photo of a LRT stop in Long Beach, California I took in 2013. I do not recall seeing a fence anywhere along the route and I watched the train make a 90 degree turn and have no recollection of noise.

This station is neat because it has a bike station built into it. I think that is a ride share thing they do out there.

[Image: IMG_1831_zps57zmilfm.jpg]


RE: ION - Waterloo Region's Light Rail Transit - nms - 04-15-2015

Article 14 of the Project Agreement gives some ideas of what to expect, notable, that the aBRT and LRT system should "read as one system" so it is very likely that the current aBRT stops will be very similar in design to the LRT stops.  Oddly, Article 14 refers to Appendix L for specific designs, but Appendix L is missing from the list of Project Agreement documents.

Lifting a few sections from Article 14, here is what is expected:

"The LRT Stops will be at-grade LRT vehicle loading/unloading areas composed of open air shelters at street level and platforms. ... [They will] Provide a comfortable ambient environment, adequate lighting, personal comfort, aesthetic quality, supplementary services, weather protection, and security. As the time spent by patrons in aggregate is substantial, the environment for patrons waiting for a LRT train must not only be safe and secure, but should also be enjoyable, comfortable and informative."

"Architecture
(i) The architectural concept of LRT Stops shall reflect the attributes of simplicity, economy, functionality, aesthetics, marketability, serviceability and safety as well as blend in with the local styles of the adjacent community. 
(ii) Create a civic architecture that is permanent, has a characteristic thread and contributes to its context – one that is not entirely derivative of the transit system, but of the neighborhoods and community of which it is a part.
(iii) Provide patron seating at shelters and other protected locations on the platform and protect transit passengers from adverse weather conditions (rain, wind and sun) and vehicular traffic.
(iv) Make transit safe, secure, friendly, fun and accessible to all, including users with disabilities. 
(v) Develop systems that use durable, low maintenance materials and minimize life cycle costs.
(vi) Provide patron seating at shelters and other protected locations on the platform "

"The facilities must be able to serve the needs of patrons efficiently, economically, safely, conveniently, and comfortably. These LRT Stops shall also provide for the traditional requirements of public transit systems: identity in neighborhoods or downtown areas as a location for public transit, shelter from severe weather, and cover and/or screening from average weather conditions."


RE: ION - Waterloo Region's Light Rail Transit - taylortbb - 04-15-2015

I'll also note the agreement requires that heated shelters be provided at some stations (Conestoga, Northfield, Hospital, Block Line, Fairview), and that all stations are designed to support the future installation of heated shelters.