One Young (née Mayfair Hotel) | 5 fl | Complete - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4) +--- Forum: Urban Areas (https://www.waterlooregionconnected.com/forumdisplay.php?fid=5) +--- Thread: One Young (née Mayfair Hotel) | 5 fl | Complete (/showthread.php?tid=299) |
RE: Mayfair Hotel | 6 fl | Proposed - tomh009 - 06-06-2019 Ground has been broken! It's not exactly a hive of activity yet, but at least there is an excavator on site. RE: Mayfair Hotel | 6 fl | Proposed - kalis0490 - 06-08-2019 This is a drawing of what I think that One Young will look like (in terms of massing): Centre block is going to be the place to be with City Centre 1, Young Condos, 45 Duke, One Young, and the new office building fronting King RE: Mayfair Hotel project | 6 fl | U/C - panamaniac - 06-08-2019 This is actually happening years sooner than I feared might be the case, which is a good thing. I still haven't decided whether the image of the old Mayfair on the glass cladding is going to be fabulous or tacky - could go either way, istm. RE: Mayfair Hotel | 6 fl | Proposed - tomh009 - 06-08-2019 (06-08-2019, 04:48 PM)kalis0490 Wrote: This is a drawing of what I think that One Young will look like (in terms of massing): It will actually merit the name "centre block"! RE: Mayfair Hotel project | 6 fl | U/C - KingandWeber - 06-17-2019 Lots of action onsite today with a digger and some other equipment moving a lot of dirt. RE: Mayfair Hotel project | 6 fl | U/C - tomh009 - 07-07-2019 Excavation is progressing. RE: Mayfair Hotel project | 6 fl | U/C - kwtech - 08-03-2019 As of Aug 3 2019 RE: Mayfair Hotel project | 6 fl | U/C - panamaniac - 08-03-2019 I've forgotten - will this building have any parking below ground level? RE: Mayfair Hotel project | 6 fl | U/C - Spokes - 08-06-2019 I don't know if we know do we RE: Mayfair Hotel project | 6 fl | U/C - tomh009 - 08-13-2019 It looks like they have stopped digging, so I would say that they are planning to rely on the city hall parking garage. RE: Mayfair Hotel project | 6 fl | U/C - panamaniac - 08-13-2019 I'm surprised that they haven't had to put shoring in along the side of the neighbouring building. RE: Mayfair Hotel project | 6 fl | U/C - kwtech - 08-25-2019 Sat Aug 24th, digging continuing RE: Mayfair Hotel project | 6 fl | U/C - kwtech - 08-31-2019 Aug 31st, rebar/mesh going down for what I assume will be basement slab RE: Mayfair Hotel project | 6 fl | U/C - Spokes - 09-01-2019 Basement slab or crane pad? RE: Mayfair Hotel project | 6 fl | U/C - kwtech - 11-16-2019 Good point re: crane. I have a hard time visualizing a crane at that site given its size and how very in the core it is. Picture update: |