01-03-2019, 09:15 AM
(01-03-2019, 08:03 AM)Rainrider22 Wrote: I would think it will be a while before we see a crane. A lot of shoring and caisson wall before excavation can even begin. I am guessing summer time for a crane at the earliest. This will likely be a deep hole like Charlie West..
I think the crane will go up much sooner. DTK has a permit for 39 floors + 1 below grade so there would be no reason for a really deep hole. But I'm not an engineer.....