12-01-2016, 02:30 PM
Interesting set of pictures just posted by the GRT Twitter, of the site of the Charles St Terminal before and during construction.
Note that even in the lower picture, one building remains facing Gaukel - this was the original Gray Coach terminal.
#TBT to the Bullas block in downtown Kitchener, before and after work started on the Charles Street Terminal. pic.twitter.com/oHfjfHbwNy
— Grand River Transit (@GRT_ROW) December 1, 2016
Note that even in the lower picture, one building remains facing Gaukel - this was the original Gray Coach terminal.