04-19-2018, 12:43 PM
(This post was last modified: 04-19-2018, 12:45 PM by robdrimmie.
Edit Reason: Adding clarification
)
There's something in the contract that allows them to get away with only paving a strip that is perhaps a foot-and-a-half wide, and this strip does not need to be connected to a sidewalk at all. It is absurd.
Edited to add: This is supposition. I have not seen the contract, but based on my complaints and actions I've seen as a result, this sort of minimal effort seems to be enough to satisfy the wording.
Edited to add: This is supposition. I have not seen the contract, but based on my complaints and actions I've seen as a result, this sort of minimal effort seems to be enough to satisfy the wording.