Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 15 Vote(s) - 3.93 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
Aren't we at the point where "for" or "against" LRT is a tad irrelevant?
Reply


/\ I would certainly think so, but it doesn't seem to be the case.
Reply
@panamaniac maybe for waterloo and Brantford certainly not for Cambridge, Hamilton, London, and Mississauga. Even more so this coverage may be important to the success of those projects.
Reply
Brantford?
Reply
@dhlawrence. Sorry Brampton.

Also I would agree CTV has a generally slightly anti-LRT slant. That's either a reflection of or the cause of the extremely anti-LRT views of their Facebook followers.
Reply
Bidding opened up today for Transit Hub


http://www.570news.com/2017/05/03/region...-contract/
Reply
Very exciting - can't wait to see what they come up with!
Reply


...how do you open bidding without publicly announcing whether your consultations yielded requirements that the buildings on site be:
A) Up to 30 storeys
B) 10-15 storeys
C) 4-6 storeys
As these were the options (roughly) that I recall from a consultation on the site plan.
Reply
(05-03-2017, 10:57 AM)Viewfromthe42 Wrote: ...how do you open bidding without publicly announcing whether your consultations yielded requirements that the buildings on site be:
A) Up to 30 storeys
B) 10-15 storeys
C) 4-6 storeys
As these were the options (roughly) that I recall from a consultation on the site plan.

Does any of that constitute "requirements"?  I thought that the scale of development was just conceptual.
Reply
This is just the Qualifications stage.  Applicant teams submit their previous project experience and financial information and will be scored to determine a short list of proponents who will compete in the RFP stage.  Qualification stage closes the end on June, and sounds like short listed teams will be announced by September.
Reply
(05-03-2017, 10:57 AM)Viewfromthe42 Wrote: ...how do you open bidding without publicly announcing whether your consultations yielded requirements that the buildings on site be:
A) Up to 30 storeys
B) 10-15 storeys
C) 4-6 storeys
As these were the options (roughly) that I recall from a consultation on the site plan.

The height of the buildings is not the hard part.  The hard part is a unified transit centre.

But more to the point, much like a high-end jewelry store, if you have to ask, then you can't afford it.  You need to prove that you are capable of building a unified transit hub with 30 storey buildings on top. The actual size of the hub will be based on market factors, and they want a partner that can handle anything.

Here's the RFQ:
https://regionofwaterloo.bidsandtenders....704ea1a5e0
Reply
If you tell a bidder to come in with what they can give you if you let them build 30 storeys, and then say that they can only build 4, you get an incredibly different set of buildings, because a developer doing the whole site will absolutely give you more features and bang for your buck for every floor of building you give them. But if you don't tell them how much of the profit-generation they can have (aka how many floors can they build), they will tell you what you get for the worst case (6 floors), and you will only get builders who would do the 6 floor one like crap, instead of better builders who could do much better hubs, but would need to know they can sell 30 floors of condos to subsidize a better transit hub. We do not want them going in having to think that they can only build 6 floors potentially, show us what that gets, and then allow 30 storeys, but at that point wind up with none of the hub-design benefits of those 30 floors, because they gave you only what 6 storeys would fund.
Reply
   
Lovely deep-blue glass tiles are up on the anchor wall at Waterloo Town Square.  Gorgeousness!

   
Crews are well on their way with the reconfiguration of the access points to the North lot.
Reply


I was around there today too and was surprised at how quickly everything is progressing along that stretch.

I was wondering though, why does William have a "no right turn on red sign" and not the big black LED signs to limit turns like at Willis?
Conversely, why doesn't Willis have a "no right turn on red sign"? Why would it be safe to turn right on a red at Willis, but not at William? The visibility is actually better at William.

Also, I think the Willis Way stop's accessibility is lacking. Consider if you are walking west along Willis toward Caroline and the Ion stop. If you need an accessible route to the Ion platform you either need to:
1) Walk 40m north (away from the platform) to Father David Bauer, cross Caroline (unassisted – no signals, although refuge is another 20m north), then walk 75m south back to the platform (~130m total)
or
2) Walk 110m further south (the length of the platform and then some) toward Alexandria and cross Caroline to the platform entrance (~120m total).

There's no accessible route directly across Caroline on the north end of the platform like there is on the south end.
Everyone move to the back of the bus and we all get home faster.
Reply
Why do some track switches have blowers and some not? In the North lot picture, the top switch has a blower, while the bottom does not. Or they still installing them?
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 17 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links