09-20-2015, 10:42 PM
(09-20-2015, 10:17 PM)Canard Wrote: Quite a big deal. Installation of gauntlet tracks, reconfiguration of OCS, underground utilities, etc - non trivial
Non-trivial, but easily doable if there is a good reason. London and Paris are plastered with closed down metro stations which were replaced by others. The reason I don't think it would happen is that the current placement at the R&T is in the best possible location, given the LRT track.