11-17-2015, 11:26 AM
It was the NB curbs that were the permanent concrete ones, actually. All others (SB (Union to Allen, Both directions Allen to William) were temporary.
Benton is also up to grade now. Wouldn't be surprised if we see paving here today.
Also: embedded track across FDB was poured. They must need to repave the streets here, because at the height it was at, it's pretty much a speed bump.
Benton is also up to grade now. Wouldn't be surprised if we see paving here today.
Also: embedded track across FDB was poured. They must need to repave the streets here, because at the height it was at, it's pretty much a speed bump.