07-15-2015, 06:26 PM
(07-15-2015, 11:26 AM)Markster Wrote: Conditions this morning:
Water was still overflowing the upper dam, and the lower dam was again washed out
They've got 16 units in the ground already, and there's the 8 left to go.
I'm sure they didn't expect that the only real rain this summer would come during their 2 week build, and in substantial downpours at that. There are reasonable precautions, and they've clearly landed on the bad luck side of things.
Are you sure you have the right numbers? I thought there were to be 3 tunnels of 10 segments each, and that 4 segments each for a total of 12 had been installed, leaving 18 remaining to be installed. Today I thought I saw at least 8 or 10 segments sitting near the road and I’m not aware that any were installed today.
In other news, Caroline has now had pavement removed right up to the pedestrian crosswalk at Erb, except for a little bit around the existing railway tracks.