09-29-2018, 12:36 PM
I don't quite understand the problem with moving the proposed GO station, there is nothing to physically move yet; only a bit of new track would need to be put down to connect to the airport and wouldn't add that much to the route time and would have much more potential utility and potential users.
I understand the location has been vetted by MetroLinx, but there is still lots of time to re-evaluate the situation. Especially if YKF is supposed going to be taking the overflow from Pearson; it makes sense to invest a little more now to ensure that the connectivity is ready to go when (if) the overflow comes.
From what I can see the initial part of the “transit oriented development” by Thomasfield Homes (aka Hopewell Crossing or Hopewell Heights) is largely just marketing (I think Thomasfield actually own all the land south of the tracks in that area too). The high density residential, employment and commercial components come much later (if ever).
The first phases are a strong majority of single family homes (summer 2019) many of which will be beyond the 800m walking radius often used as a catchment area for potential active transportation users of transit. Most of the high density or medium density residential is also beyond the 800m radius. The area won't be serviced by transit any time soon so residents will need car to get school, work, groceries, or entertainment for the medium term at a minimum.
So, if the GO station was always intended as a park-and-ride sub-urban station as you can’t reach it from east Kitchener or north Cambridge by transit so anyone from those areas will be driving, and if the residents closest to the proposed station are car dependent already why not move the station to where it can serve more people?
For example:
-for Kitchener residents east of 85 and north of Ottawa to GO station @ Greenhouse Road is 12min but to one at YFK it is 11min (and even faster when the Ottawa bridge is built)
-for Kitchener residents east of 85 and south of Ottawa YFK will always be faster
-for Cambridge residents a YFK GO station will always be faster
I understand the location has been vetted by MetroLinx, but there is still lots of time to re-evaluate the situation. Especially if YKF is supposed going to be taking the overflow from Pearson; it makes sense to invest a little more now to ensure that the connectivity is ready to go when (if) the overflow comes.
From what I can see the initial part of the “transit oriented development” by Thomasfield Homes (aka Hopewell Crossing or Hopewell Heights) is largely just marketing (I think Thomasfield actually own all the land south of the tracks in that area too). The high density residential, employment and commercial components come much later (if ever).
The first phases are a strong majority of single family homes (summer 2019) many of which will be beyond the 800m walking radius often used as a catchment area for potential active transportation users of transit. Most of the high density or medium density residential is also beyond the 800m radius. The area won't be serviced by transit any time soon so residents will need car to get school, work, groceries, or entertainment for the medium term at a minimum.
So, if the GO station was always intended as a park-and-ride sub-urban station as you can’t reach it from east Kitchener or north Cambridge by transit so anyone from those areas will be driving, and if the residents closest to the proposed station are car dependent already why not move the station to where it can serve more people?
For example:
-for Kitchener residents east of 85 and north of Ottawa to GO station @ Greenhouse Road is 12min but to one at YFK it is 11min (and even faster when the Ottawa bridge is built)
-for Kitchener residents east of 85 and south of Ottawa YFK will always be faster
-for Cambridge residents a YFK GO station will always be faster
Everyone move to the back of the bus and we all get home faster.