Waterloo Region Connected
Midtown Lofts | ?m | 6 fl | Complete - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4)
+--- Forum: Urban Areas (https://www.waterlooregionconnected.com/forumdisplay.php?fid=5)
+--- Thread: Midtown Lofts | ?m | 6 fl | Complete (/showthread.php?tid=394)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13


RE: Midtown Lofts | ?m | 6 fl | U/C - Andy - 05-26-2016

On that same note, I tried this restaurant in Portland, which serves Indian style pizza http://www.yelp.com/biz/curry-and-crust-hillsboro-2 . It was actually pretty good, but it didn't have the same leftover quality that cheese + tomatoes do.


RE: Midtown Lofts | ?m | 6 fl | U/C - C Plus - 05-29-2016

Looks like they hit ground water in the excavating. I may have to go for a swim if this heat continues.


RE: Midtown Lofts | ?m | 6 fl | U/C - KevinL - 06-08-2016

Big hole (but no groundwater) spotted today:

[Image: 4yAvS5K.jpg]

[Image: nVG64NS.jpg]


RE: Midtown Lofts | ?m | 6 fl | U/C - Pheidippides - 08-26-2016

Seemingly not a lot of progress:
   


RE: Midtown Lofts | ?m | 6 fl | U/C - C Plus - 10-08-2016

The crane is going up tomorrow


RE: Midtown Lofts | ?m | 6 fl | U/C - C Plus - 10-10-2016

So they have a crane on continuous tracks in 'the hole'. I believe the rest of this building will be assembled using prefabricated concrete.


RE: Midtown Lofts | ?m | 6 fl | U/C - Pheidippides - 10-18-2016

   


RE: Midtown Lofts | ?m | 6 fl | U/C - KevinL - 11-05-2016

November 5, 2016:

[Image: wHXgLN9.jpg]

[Image: PhAenc0.jpg]


RE: Midtown Lofts | ?m | 6 fl | U/C - rangersfan - 11-05-2016

Nice to see this progressing.


RE: Midtown Lofts | ?m | 6 fl | U/C - MidTowner - 12-14-2016

They are up above grade now, and when I walked by this afternoon were removing forms. Slow and steady.


RE: Midtown Lofts | ?m | 6 fl | U/C - C Plus - 12-14-2016

I wonder how they will erect the section the crane is currently sitting in once it has to be removed


RE: Midtown Lofts | ?m | 6 fl | U/C - C Plus - 12-24-2016

They have removed the mobile crane.


RE: Midtown Lofts | ?m | 6 fl | U/C - Pheidippides - 03-07-2017

Tower crane is up:
   


RE: Midtown Lofts | ?m | 6 fl | U/C - rangersfan - 05-08-2017

The project was well into the second floor when I went by this afternoon.


RE: Midtown Lofts | ?m | 6 fl | U/C - Coke6pk - 05-08-2017

(05-08-2017, 03:44 PM)rangersfan Wrote: The project was well into the second floor when I went by this afternoon.

This project seems to be stuck on 2 stories for the last couple of weeks.... I was wondering if there was something holding up progress....

Coke