![]() |
|
GO Transit - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: GO Transit (/showthread.php?tid=12) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
|
RE: GO Transit - tomh009 - 09-19-2021 (09-19-2021, 09:47 AM)ijmorlan Wrote:(09-17-2021, 04:17 PM)Bytor Wrote: Kitchener→Union Station is finally competitive time-wise after the recent minimal upgrade work (1:41 station to station, vs ~1:50 driving), it's just not convenient in terms of scheduling. However, track work can still be done K→U as the best possible time for an all-stops run with Class 3 tracks and 2 minute dwells is ~1:27. Inwards past Mount Pleasant the stations are too close together for trains to go any faster, but Class 5 tracks would shorten up K→MP times and the complete all-stops run would be ~1:16, making it competitive with cars outside of rush hour as well. 1:27 is respectable (with current track). 1:16 is already quite good. Presumably either one of these would be somewhat better with an express service, too. Are any of these improved by removing some of the current level crossings? Or are those already good enough to not have an impact? RE: GO Transit - Bytor - 09-20-2021 (09-19-2021, 08:41 PM)tomh009 Wrote:(09-19-2021, 09:47 AM)ijmorlan Wrote: Thanks for working this out. It’s really amazing how much improvement would be possible with changes that would be much less expensive than building HSR. Level crossings with crossbucks can be used for Class 6 tracks (110mph, 177km/h), according to my understanding of Transport Canada rail regulations, so none of them would need to be removed. The only modifications I assumed for my numbers was getting ride of the small number of curves that were too small a radius. RE: GO Transit - Acitta - 09-27-2021 Not Just Bikes: Commuter rail is a rail system designed to bring people from the suburbs into a central business district for work. But is it really an efficient transit system, or just another subsidy provided to car-dependent suburbanites? This video explores commuter rail in the Greater Toronto Area (GTA), the train system known as "GO Transit." The Trains that Subsidize Suburbia - GO Transit Commuter Rail RE: GO Transit - Coke6pk - 10-16-2021 GO train speeds to more than quadruple through Guelph - Guelph News https://www.guelphtoday.com/local-news/go-train-speeds-to-more-than-quadruple-through-guelph-4515823 RE: GO Transit - timio - 10-16-2021 I saw some back of the napkin calculations that showed this roughly translated to only a few minutes time savings because the stretch of track with the speed increase is so short (~2k from Hanlon to Guelph station). But I guess any increase is better than the current crawl into Guelph station. RE: GO Transit - ijmorlan - 10-16-2021 (10-16-2021, 01:24 PM)timio Wrote: I saw some back of the napkin calculations that showed this roughly translated to only a few minutes time savings because the stretch of track with the speed increase is so short (~2k from Hanlon to Guelph station). But I guess any increase is better than the current crawl into Guelph station. A few minutes here, a few minutes there … not too long until the service is noticeably better than before. But yes, each individual area has only so much potential for improvement. RE: GO Transit - KevinL - 10-16-2021 On the east side of Guelph station, I understand the bridge is getting rehabilitated (and perhaps double-tracked?) as well. RE: GO Transit - timio - 10-16-2021 Replacing the spans for single track, but leaving capacity for future growth. https://blog.metrolinx.com/2021/05/13/guelph-bridge-work-the-next-phase-of-kitchener-go-line-expansion/ RE: GO Transit - jamincan - 10-16-2021 I believe they replaced the Speed River spans over a few weekends a few weeks ago. RE: GO Transit - GtwoK - 10-16-2021 Still working on them today — drove past as a large span of the bridge was missing. Tons of people stopping to take photos RE: GO Transit - Bytor - 11-17-2021 Trains before Lanes https://www.therecord.com/opinion/2021/11/17/trains-before-lanes-new-highway-7-and-other-road-projects-wont-address-climate-change.html RE: GO Transit - Bytor - 11-18-2021 Waterloo Region takes step towards closing Duke Street for transit hub https://www.therecord.com/news/waterloo-region/2021/11/17/waterloo-region-takes-step-towards-closing-duke-street-for-transit-hub.html RE: GO Transit - Bob_McBob - 12-02-2021 Metrolinx puts rail electrification through Guelph on hold RE: GO Transit - danbrotherston - 12-02-2021 Gee, if only they had some way to gain ownership over the corridor. Frankly, I'm not even remotely surprised...I don't get any sense of urgency or goals from any of Metrolinx. They're going through the motions...something might get built eventually, but they aren't pushing on it. RE: GO Transit - KingandWeber - 12-02-2021 (12-02-2021, 11:05 AM)danbrotherston Wrote: Gee, if only they had some way to gain ownership over the corridor. To be fair, I don't think Metrolinx can expropriate a railway as that's within federal jurisdiction. That being said, why on Earth they haven't worked with the federal govt to expropriate it is beyond me. |