Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166 1167 1168 1169 1170 1171 1172 1173 1174 1175 1176 1177


RE: ION - Waterloo Region's Light Rail Transit - Acitta - 09-15-2025

(09-15-2025, 04:57 PM)tomh009 Wrote:
(09-15-2025, 04:12 PM)Acitta Wrote: No, I have not lived in a European country. I know that they take their public transit much more seriously than car-centric Canadian cities. However, the only people who complain about better public transit are the car-brained idiots who never use it. The ION is well-used, even if it is not as well-designed as it could have been. Public transit, in general, is well-used in the Region.

I grew up in Europe and have lived there for long stretches since then. And I have spent close to two years in Japan, too. The key underlying factor is that European cities generally are, and generally always have been, much more urban than North American cities. As a result, they are far less car-centric, and far more people walk, cycle and take transit--and the same is true in Japan as well.

You hate that fact that the LRT is above ground, but LRT and tram systems are common in Europe as well. But it is indeed driving both ridership and development, roughly meeting its original goals (COVID-19 impacted it along the way).

I don't see any point in arguing this with you any further as there is no way to have a reasoned debate with you on this topic
I assume that you were replying to ac3r and not me.


RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 09-15-2025

(09-15-2025, 07:21 PM)Acitta Wrote: I assume that you were replying to ac3r and not me.

Yes ... my post quoted both of you, and I was supporting your post.


RE: ION - Waterloo Region's Light Rail Transit - Momo26 - 09-17-2025

this is well thought out

https://www.reddit.com/r/waterloo/s/f23OsA1lDk


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 09-22-2025

Pretty in depth discussion with two interviews about the costs of the Waterloo ION transit project.

https://www.youtube.com/watch?v=uttoyAX4ntc

Unfortunately, didn't really touch on the Cambridge extension.


RE: ION - Waterloo Region's Light Rail Transit - MidTowner - 09-24-2025

(09-22-2025, 03:17 PM)danbrotherston Wrote: Pretty in depth discussion with two interviews about the costs of the Waterloo ION transit project.

https://www.youtube.com/watch?v=uttoyAX4ntc

Unfortunately, didn't really touch on the Cambridge extension.

Unfortunately none of the factors they identified as being the reason for the economical cost of Phase I apply to the Cambridge extension.

I'm in favour of the Cambridge extension, but if residents generally think it's too expensive, and we could get support for a much cheaper line from Central Station to the airport, or along University Ave, I'd be in favour of getting that done along the lines of Phase I.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 09-24-2025

(09-24-2025, 07:31 AM)MidTowner Wrote:
(09-22-2025, 03:17 PM)danbrotherston Wrote: Pretty in depth discussion with two interviews about the costs of the Waterloo ION transit project.

https://www.youtube.com/watch?v=uttoyAX4ntc

Unfortunately, didn't really touch on the Cambridge extension.

Unfortunately none of the factors they identified as being the reason for the economical cost of Phase I apply to the Cambridge extension.

I'm in favour of the Cambridge extension, but if residents generally think it's too expensive, and we could get support for a much cheaper line from Central Station to the airport, or along University Ave, I'd be in favour of getting that done along the lines of Phase I.


I think is an aspect driving the cost in Cambridge that was mentioned. Specifically that everyone is on board and pushing in the same direction. I think a lot of the cost is being driven by changes that are made at the behest of people who simply don't want the transit line built. IMO ignoring those people is the right thing to do, pandering to them actually helps them, because it makes it more expensive and thus less likely to be built, without actually getting them on board (because their objection was never "it's here" and instead was "it's everywhere"). And yeah, I realize it's not black and white, that these changes do move the margins of support (a few people in the middle move to supporting, a few opponents move to the middle) but these are always cost trade offs, and when you are spending money to appease these few people on the margins, you're also making the system harder to build because of cost, while not making the system more valuable (or sometimes even less so often).



But that issue only got a passing reference, so I think it's reasonable to have missed it.

That said I'm sure there are many other facts both legitimate (you have to cross the rivers) and illegitimate (the public sector is charging more for risk today) that make the project cost more. It's also a shame that the Cambridge section of the project delivers less value (at least to start) than the Kitchener/Waterloo segment. Politically I don't know how viable it is to skip Cambridge, but from a pure economic value proposition, it probably makes sense to deliver more transit lines in KW than to go to Cambridge right now. Not that I'm saying that's the right decision or even that "economic value" should be a primary indicator in decision making (I mean, plenty accuse me of being a liberal, but I'm not).


RE: ION - Waterloo Region's Light Rail Transit - MidTowner - 09-24-2025

That was one of the aspects they mentioned that I was referring to, that we knew what we wanted to do with Phase I, and didn't have a lot of changes. Related to the fact that a lot of people were in favour.

Contrast that with Cambridge, we don't know if it's worth the cost, we aren't committed to a route, almost every aspect of the route someone will be pushing to have it changed because it costs too much, or ruins the character of a downtown, or eliminates too much road capacity, or whatever.

I'm not sure if economic value should be the primary motivation, either. But if it's uncertain whether Cambridge as a whole even wants the thing, and the economic value also isn't there, maybe we should have a conversation about whether another cheapo line in KW where people will be on board is the way to go.


RE: ION - Waterloo Region's Light Rail Transit - Rainrider22 - 09-24-2025

Interesting you tube on ION

https://youtu.be/uttoyAX4ntc?si=oRHM1t6DxfmmB0O1


RE: ION - Waterloo Region's Light Rail Transit - ZEBuilder - 09-24-2025

(09-24-2025, 07:25 PM)ac3r Wrote: For what the Cambridge line is going to cost, you could build the Line 5 Sheppard subway in Toronto...three times! And 3 of those would still cost less than what the Cambridge extension is projected to cost. That is also taking into account the inflation changes of 1 billion dollars in 2002 to now.

There is no universe in which it makes any sense to build a full fledged LRT to Cambridge now or any time soon, unless you just really love burning tax payer money. BRT could easily suffice to suit the needs of people who live in Cambridge and allow funds to be reallocated to either another Kitchener-Waterloo line that may go east to west or just...literally anything else. Then say in 10-15+ years when the region is closer to a million people and the landscape - geographical, economic, political etc - changes then maybe they can revisit the idea. What use is an LRT now when you have citizens and politicians that seem to hate the idea of density and growth? If you think Cambridge NIMBYs are bad now when it comes to approving tall or even medium buildings, they'll revolt if they had an LRT and developers started proposing 55+ floor skyscrapers like we now have in Kitchener. Every other project would be cancelled or dragged out at the OLT, taking even more time and money out of everyone's pockets.

Get your facts straight before you go spewing nonsense like you always do.

First the Sheppard Line in Toronto is Line 4 not 5. Secondly it cost 1 billion dollars to build, it opened in 2002, assuming that 1 billion dollars is in 2002 dollars it would be equivalent to 1.6 billion today. The Sheppard Line is a total of 5.5km meaning it is a grand total of 290 million dollars per km.

As has been said on here before the cost estimate for the LRT extension to Cambridge is a total of 3.1 billion in 2025 dollars for 17.5 km. This means that the LRT to Cambridge is only going to cost 170 million dollars per km.

The ION will still be built cheaper than other LRTs that are comparable, which has already been argued on here before (Hamilton, Finch, Hurontario).

Is the cost high, yes, but that doesn't mean Cambridge is any less deserving of an LRT then KW. Sure it may make more economical sense to build an LRT along Ottawa, the Region's preferred phase 3, but even then you have some difficult issues to deal with that will drive the cost up, you have the CN tracks at Mill which need grade separation (if you're going above them you need at least 7m of clearance), 3 roundabouts to cross, how are you connecting to Phase 1, how are crossing the highway (the MTO can be difficult when it comes to their bridges), where are you expropriating land from at Ottawa and Fischer Hallman? There's just as many difficult decisions on other lines as there is on Phase 2.


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 09-25-2025

I meant to repost that to highlight the difference in inflation between the years, because even taking into account the inflation over 2 decades it still demonstrates how incapable this country is at doing anything. Thanks for doing the work for me 🤓.


RE: ION - Waterloo Region's Light Rail Transit - trainspotter139 - 09-28-2025

(09-24-2025, 08:25 AM)danbrotherston Wrote:
(09-24-2025, 07:31 AM)MidTowner Wrote: Unfortunately none of the factors they identified as being the reason for the economical cost of Phase I apply to the Cambridge extension.

I'm in favour of the Cambridge extension, but if residents generally think it's too expensive, and we could get support for a much cheaper line from Central Station to the airport, or along University Ave, I'd be in favour of getting that done along the lines of Phase I.


I think is an aspect driving the cost in Cambridge that was mentioned. Specifically that everyone is on board and pushing in the same direction. I think a lot of the cost is being driven by changes that are made at the behest of people who simply don't want the transit line built. IMO ignoring those people is the right thing to do, pandering to them actually helps them, because it makes it more expensive and thus less likely to be built, without actually getting them on board (because their objection was never "it's here" and instead was "it's everywhere"). And yeah, I realize it's not black and white, that these changes do move the margins of support (a few people in the middle move to supporting, a few opponents move to the middle) but these are always cost trade offs, and when you are spending money to appease these few people on the margins, you're also making the system harder to build because of cost, while not making the system more valuable (or sometimes even less so often).



But that issue only got a passing reference, so I think it's reasonable to have missed it.

That said I'm sure there are many other facts both legitimate (you have to cross the rivers) and illegitimate (the public sector is charging more for risk today) that make the project cost more. It's also a shame that the Cambridge section of the project delivers less value (at least to start) than the Kitchener/Waterloo segment. Politically I don't know how viable it is to skip Cambridge, but from a pure economic value proposition, it probably makes sense to deliver more transit lines in KW than to go to Cambridge right now. Not that I'm saying that's the right decision or even that "economic value" should be a primary indicator in decision making (I mean, plenty accuse me of being a liberal, but I'm not).

One of the reasons driving the increase in cost is private companies being more risk-averse. After COVID and the absolute BS Metrolinx has been putting many of these companies through with the Finch West, Eglinton Crosstown and Hazel McCallion LRT lines, they're less willing to take on the financial risk without being provided with a larger contingency pool. Interest rates are much higher (back in 2014 the prime rate averaged around 3.25% when these cost estimates were updated prime rate had ballooned to 7.2% ) than they were when the Grandlinq consortium acquired their financing for Stage 1 so the 30-year financing costs for Stage 2 are also going to be much higher.

For example, if the future consortium were to source financing of $1.5 billion for the project:

In July 2019, prime rate was 3.95%: 

30 year total cost of that financing would be $2,562,501,073.80 of which $1,062,501,073.80 would be interest. Monthly payments would be $7,118,058.54. 59% of the total cost is the principal and 41% is the interest.

In July 2023, prime rate was 7.20%:

30 year total cost of that financing would be $3,665,456,331.12 of which $2,165,456,331.12 would be interest. Monthly payments would be $10,181,823.14. 41% of the total cost is the principal and 59% is the interest. 

In all, the cost estimate in 2023 (which is ~$3.11 billion more than in 2019) was probably accounting for about half a billion in total combined inflationary increases (wage pressures from labour shortages, post-pandemic inflation, etc) from 2019 to 2023, half a billion in increased risk management due to the technical requirements of the project, 1.5 billion in contingencies simply because of how geo-technical this stage is going to be, and the rest in increased capital cost (increased cost of acquiring land and vehicles plus the increase in financing costs and estimated inflation during the construction period). 

I'm sure now, since rates have come down, if they were to put this out for tender the real cost would be lower than the estimate, but for now they are sticking with this estimate to be conservative especially since they still haven't secured funding for the project yet and nobody can predict what's going to happen between now and when this project is ready to be put out for tender.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 09-28-2025

(09-28-2025, 07:28 AM)trainspotter139 Wrote:
(09-24-2025, 08:25 AM)danbrotherston Wrote: I think is an aspect driving the cost in Cambridge that was mentioned. Specifically that everyone is on board and pushing in the same direction. I think a lot of the cost is being driven by changes that are made at the behest of people who simply don't want the transit line built. IMO ignoring those people is the right thing to do, pandering to them actually helps them, because it makes it more expensive and thus less likely to be built, without actually getting them on board (because their objection was never "it's here" and instead was "it's everywhere"). And yeah, I realize it's not black and white, that these changes do move the margins of support (a few people in the middle move to supporting, a few opponents move to the middle) but these are always cost trade offs, and when you are spending money to appease these few people on the margins, you're also making the system harder to build because of cost, while not making the system more valuable (or sometimes even less so often).



But that issue only got a passing reference, so I think it's reasonable to have missed it.

That said I'm sure there are many other facts both legitimate (you have to cross the rivers) and illegitimate (the public sector is charging more for risk today) that make the project cost more. It's also a shame that the Cambridge section of the project delivers less value (at least to start) than the Kitchener/Waterloo segment. Politically I don't know how viable it is to skip Cambridge, but from a pure economic value proposition, it probably makes sense to deliver more transit lines in KW than to go to Cambridge right now. Not that I'm saying that's the right decision or even that "economic value" should be a primary indicator in decision making (I mean, plenty accuse me of being a liberal, but I'm not).

One of the reasons driving the increase in cost is private companies being more risk-averse. After COVID and the absolute BS Metrolinx has been putting many of these companies through with the Finch West, Eglinton Crosstown and Hazel McCallion LRT lines, they're less willing to take on the financial risk without being provided with a larger contingency pool. Interest rates are much higher (back in 2014 the prime rate averaged around 3.25% when these cost estimates were updated prime rate had ballooned to 7.2% ) than they were when the Grandlinq consortium acquired their financing for Stage 1 so the 30-year financing costs for Stage 2 are also going to be much higher.

For example, if the future consortium were to source financing of $1.5 billion for the project:

In July 2019, prime rate was 3.95%: 

30 year total cost of that financing would be $2,562,501,073.80 of which $1,062,501,073.80 would be interest. Monthly payments would be $7,118,058.54. 59% of the total cost is the principal and 41% is the interest.

In July 2023, prime rate was 7.20%:

30 year total cost of that financing would be $3,665,456,331.12 of which $2,165,456,331.12 would be interest. Monthly payments would be $10,181,823.14. 41% of the total cost is the principal and 59% is the interest. 

In all, the cost estimate in 2023 (which is ~$3.11 billion more than in 2019) was probably accounting for about half a billion in total combined inflationary increases (wage pressures from labour shortages, post-pandemic inflation, etc) from 2019 to 2023, half a billion in increased risk management due to the technical requirements of the project, 1.5 billion in contingencies simply because of how geo-technical this stage is going to be, and the rest in increased capital cost (increased cost of acquiring land and vehicles plus the increase in financing costs and estimated inflation during the construction period). 

I'm sure now, since rates have come down, if they were to put this out for tender the real cost would be lower than the estimate, but for now they are sticking with this estimate to be conservative especially since they still haven't secured funding for the project yet and nobody can predict what's going to happen between now and when this project is ready to be put out for tender.

Boy...do I have a bridge to sell you.

All joking aside (although I'm not joking when I say that the I find the idea that the tender would come in below the estimate is...lets say...naive) the things you say do have some merit. Those are definitely driving cost (and those were also mentioned in the video).

But I don't think they're the only drivers of cost. I mean, we know the changes that were made in an effort to appease the opposition in Cambridge...we know those were not inexpensive changes. These things are not controversial. I think the only controversial thing I am saying is that we should ignore the opposition from those people and do the cheapest/best value instead of trying to appease them and making the project more expensive as a result.


RE: ION - Waterloo Region's Light Rail Transit - Momo26 - 10-09-2025

https://www.reddit.com/r/kitchener/s/aAOBNJGOop

Another one!


RE: ION - Waterloo Region's Light Rail Transit - Momo26 - 10-10-2025

(09-22-2025, 03:17 PM)danbrotherston Wrote: Pretty in depth discussion with two interviews about the costs of the Waterloo ION transit project.

https://www.youtube.com/watch?v=uttoyAX4ntc

Unfortunately, didn't really touch on the Cambridge extension.

Just watched this. Wow didn't realize it came in at that much less than other Canadian LRT. Sigh, just makes me think we could have gone longer at that time for those millions/km vs the costs today. 

How does Helsinki do it so much cheaper?


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 10-11-2025

They have a different culture.