![]() |
|
GO Transit - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: GO Transit (/showthread.php?tid=12) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
|
RE: GO Transit - KevinL - 06-11-2026 Indeed, most work to double track between the Shirley yard and the future Breslau station appears trivial except the Grand River bridge. RE: GO Transit - Allandale25 - 06-18-2026 (06-08-2026, 07:35 PM)ZEBuilder Wrote:(06-08-2026, 04:47 PM)taylortbb Wrote: GO will be doing consultations June 22 & 24 for track expansion between Georgetown and Bramlea, https://www.metrolinx.com/en/projects-and-programs/kitchener-line-go-expansion/events/public-information-centre-on-kitchener-corridor-expansion-june-2026 . This work is the main blocker for two-way all-day GO to KW, so hopefully we'll finally get some details about what exactly they're going to build and what the timelines are. So it won't be going to quad at Peel Memorial to Bramalea Station? RE: GO Transit - Allandale25 - 06-19-2026 Sorry, ZEBuilder, just to confirm, are the passages below from your posts above about the Credit River crossing? "It's effectively a complete rebuild of the existing bridge structure and it's planned to take until the end of 2027. It's effectively the same as what just occurred on the Etobicoke Creek Bridge next to Long Branch GO on the Lakeshore West Line. The construction notice says "the scope of work includes the replacement of bridge spans, rehabilitation of existing piers, and construction of new piers and abutments to support the new structure". The fact it says construction of new piers and abutments along with rehabilitation makes it seem like they're twinning the bridge, the duration is also rather extensive for rehab works. Later in the notice it also says the use of drill rigs is expected which aren’t the most common when it comes to rehab works, certainly possible but rare. Given all that I'd guess they're going to twin it." RE: GO Transit - nms - 06-19-2026 I've noticed that around 8:00pm there are two GO trains sitting at the Kitchener station. One is at the platform and then departs eastward after 8:15 but I don't know if that one is returning to Toronto or to storage. The mystery is the second train that is on the parallel track closer to the Krug factory. If the train is being stored for the night, would it not be easier to move it from the station platform direclty to its storage track rather than moving it one track over for a later move? RE: GO Transit - ZEBuilder - 06-19-2026 (06-19-2026, 12:18 AM)Allandale25 Wrote: Sorry, ZEBuilder, just to confirm, are the passages below from your posts above about the Credit River crossing? Those one's are related to the Grand River bridge in Kitchener. RE: GO Transit - Allandale25 - 06-19-2026 (06-19-2026, 06:09 PM)ZEBuilder Wrote:(06-19-2026, 12:18 AM)Allandale25 Wrote: Sorry, ZEBuilder, just to confirm, are the passages below from your posts above about the Credit River crossing? Got it, thanks. |