![]() |
|
UW SLC/PAC Expansion Project | ?m | 3 fl | Referendum - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4) +--- Forum: University Area (https://www.waterlooregionconnected.com/forumdisplay.php?fid=6) +--- Thread: UW SLC/PAC Expansion Project | ?m | 3 fl | Referendum (/showthread.php?tid=523) Pages:
1
2
|
RE: UW SLC/PAC Expansion Project | ?m | 3 fl | Referendum - jwilliamson - 04-04-2021 RE: UW SLC/PAC Expansion Project | ?m | 3 fl | Referendum - ijmorlan - 04-04-2021 Sadly, as far as I can tell the breezeways reaching towards QNC and BMH have disappeared from the plan. There was a model which gave the impression the breezeway would reach all the way to BMH, meaning one could walk between SLC and BMH out of the rain. |