![]() |
|
General Road and Highway Discussion - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: General Road and Highway Discussion (/showthread.php?tid=335) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
|
RE: General Road and Highway Discussion - KevinL - 07-24-2023 The Bleams extension past Manitou has the bridge basically complete - full structure including handrails is in place. There's no road either side of it, though, just a graded right of way - I presume a different contractor will complete that. RE: General Road and Highway Discussion - Acitta - 07-24-2023 (07-24-2023, 12:09 PM)KevinL Wrote: The Bleams extension past Manitou has the bridge basically complete - full structure including handrails is in place. There's no road either side of it, though, just a graded right of way - I presume a different contractor will complete that. Has the trail below reopened? RE: General Road and Highway Discussion - KevinL - 07-24-2023 Don't know, couldn't tell from the road. RE: General Road and Highway Discussion - clasher - 07-25-2023 I rode that trail a few weeks ago and there was still some dirt left on the path but it was passable. RE: General Road and Highway Discussion - ac3r - 07-28-2023 I feel like I've asked this before but maybe not. Who handles River Road by Idlewood? The condition of the road is sooooo bad that it'd knock a filling out of your teeth with all the bumps. It desperately needs repaving. It's particularly bad if you're riding the 1 bus because it just shakes like crazy. RE: General Road and Highway Discussion - neonjoe - 07-29-2023 (07-28-2023, 04:54 PM)ac3r Wrote: I feel like I've asked this before but maybe not. Who handles River Road by Idlewood? The condition of the road is sooooo bad that it'd knock a filling out of your teeth with all the bumps. It desperately needs repaving. It's particularly bad if you're riding the 1 bus because it just shakes like crazy.City of Kitchener, the Region is responsible for it from Fairway to King. https://www.regionofwaterloo.ca/en/living-here/resources/Documents/Regional-Roads-By-Name.pdf RE: General Road and Highway Discussion - ac3r - 07-29-2023 Thanks! I'm sure they know of the conditions but I still feel like I should send an email to them. It's extremely bad between Fairway and those forested areas. RE: General Road and Highway Discussion - nms - 08-03-2023 It wouldn't surprise me if their road budget has been bumped further down the capital budgets. RE: General Road and Highway Discussion - creative - 08-05-2023 They are resurfacing River road in sections. They started at Victoria street. They are working on Lorraine to Ottawa street this year. RE: General Road and Highway Discussion - timc - 08-08-2023 I noticed as part of the signage project on Highway 85 that the wording has been updated on the Regional Road 15 exit. It now says "\15/ King Street N.". While it is *technically* correct, it might be just a wee bit confusing when "\15/ King Street" is just two exits away. RE: General Road and Highway Discussion - neonjoe - 08-09-2023 (08-08-2023, 10:13 PM)timc Wrote: I noticed as part of the signage project on Highway 85 that the wording has been updated on the Regional Road 15 exit. It now says "\15/ King Street N.". While it is *technically* correct, it might be just a wee bit confusing when "\15/ King Street" is just two exits away. I do like how the new signage does include the Regional Road Numbers. I assume that \15/ King St N. St Jacob’s May be slightly less confusing than \15/ Regional Road 15 St Jacob’s Especially since the exit by the mall is now listed as \15/ King St. RE: General Road and Highway Discussion - timc - 08-09-2023 (08-09-2023, 08:37 AM)neonjoe Wrote: I do like how the new signage does include the Regional Road Numbers. It doesn't say St Jacobs. It just says \15/ King Street N. RE: General Road and Highway Discussion - neonjoe - 08-10-2023 Oh perhaps I mistook the sign that says St Jacobs next two exits with the sign in question. RE: General Road and Highway Discussion - KevinL - 08-10-2023 Passed by Westmount and Tillsley (the side street that accesses Country Hills, between Block Line and Fischer-Hallman) and noticed that they're installing temporary traffic lights (the ones hung from support cables). Is this in anticipation of permanent signals, or just due to the presumed construction that should start nearby? RE: General Road and Highway Discussion - neonjoe - 08-10-2023 (08-10-2023, 12:01 PM)KevinL Wrote: Passed by Westmount and Tillsley (the side street that accesses Country Hills, between Block Line and Fischer-Hallman) and noticed that they're installing temporary traffic lights (the ones hung from support cables). Is this in anticipation of permanent signals, or just due to the presumed construction that should start nearby? I haven't heard of any plan to urbanize that short stretch of Westmount between Blockline and Fischer Hallman but it would be good if they did. The set of lights at Tillsley would be very close to the ones at Blockline and the ones at Fischer Hallman. |