![]() |
|
GO Transit - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: GO Transit (/showthread.php?tid=12) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
|
RE: GO Transit - KevinL - 09-02-2017 What's the rationale behind that one? Can it be resolved when they double-track? RE: GO Transit - dunkalunk - 09-03-2017 The actual switch at Guelph junction is in bad shape and needs to be replaced. RE: GO Transit - Canard - 09-03-2017 https://www.cambridgetimes.ca/news-story/7531631-metrolinx-said-potential-agreement-could-shorten-timelines-for-two-way-all-day-go-train/ RE: GO Transit - KevinL - 09-03-2017 (09-03-2017, 01:41 AM)dunkalunk Wrote: The actual switch at Guelph junction is in bad shape and needs to be replaced. So if they replace it, that part of the slow order could be lifted even before double-tracking, presumably... RE: GO Transit - tomh009 - 09-03-2017 (09-03-2017, 06:48 AM)Canard Wrote: https://www.cambridgetimes.ca/news-story/7531631-metrolinx-said-potential-agreement-could-shorten-timelines-for-two-way-all-day-go-train/ Could shorten timelines, maybe -- but from the story it's not clear to me what it is that might help shorten the timelines. RE: GO Transit - KevinL - 09-03-2017 Getting control of the Bramalea-Georgetown section and being free to set their own schedule is the upshot. At the same time they'll be doubling the tracks. That amount of freedom of movement will be a real help. RE: GO Transit - tomh009 - 09-03-2017 Absolutely. But building that 30 km plus the improvements to the (too-shallow?) tunnel under the 401 would need the seven years, I thought. RE: GO Transit - Canard - 09-03-2017 Where is this 401 tunnel? RE: GO Transit - timio - 09-03-2017 Beside the current tunnel (approximately between 427 and 409) to add track capacity. RE: GO Transit - Canard - 09-03-2017 Oh, so way in Toronto - I was thinking this expansion needed to happen somewhere partway between Toronto and KW. RE: GO Transit - timio - 09-03-2017 The tunnel is just one of the projects required for expansion to the Kitchener line. CN Freight Bypass, double tracking from Georgetown through Kitchener along with whatever grade separation are required, electrification, and other projects all work together to enhance the whole. RE: GO Transit - yige_t - 09-14-2017 Metrolinx has released a draft Regional 2041 Transportation Plan: http://www.metrolinx.com/en/docs/pdf/board_agenda/20170914/20170914_BoardMtg_RTP_Report_EN.pdf Hidden within the report on page 77 is the draft 2041 HOV and Regional Express Bus network, which has some interesting nuggets for this part of the GGH: Regional Express Bus (every 30-60 minutes)
Metrolinx has also put up the presentation slides used for the August 30 presentation to Council re: Kitchener Corridor expansion: https://www.metrolinxengage.com/en/engagement-initiatives/waterloo-region RE: GO Transit - DHLawrence - 09-14-2017 Let's hope it doesn't take that long to make them happen. RE: GO Transit - KevinL - 09-14-2017 Looks like the Aberfoyle-Hamilton route hits Aldershot. If this gets weekend service, I'm all over it. RE: GO Transit - MidTowner - 09-15-2017 I was at Charles Street last night waiting for someone to get to town by Greyhound, and the line up for the Guelph bus was equal to that going to Toronto. Greyhound already runs eight buses a day Kitchener to Guelph and, as far as I can tell, they are all pretty busy. I can't imagine it taking more than twenty years before half-hourly service is justified. Good stuff about the HOV lanes through the Region, but...those are planned sometime between now and 2041? Not immediately following the widening work? |