Trails - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: Trails (/showthread.php?tid=378) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
|
RE: Trails - ijmorlan - 02-02-2018 (02-01-2018, 10:13 PM)Pheidippides Wrote: I think you mean east of Tuerk. I suspect it’s “Tuerr”, a last name of some repute. RE: Trails - KevinT - 02-24-2018 Good eyes, I missed that. My parents moved into a brand new Paul Tuerr home in the Rockway neighbourhood in 1962 that cost about $14,000. I payed more for my first car... RE: Trails - Canard - 03-13-2018 !!! This is unexpected (to me)! What is this, just a big long ramp? I see the terminology "Boardwalk"... are they building a boardwalk all the way along the tracks?! RE: Trails - KevinL - 03-13-2018 Along this stretch of the tracks, and then into the wetland-y area beside the creek there. That's what I seem to recall. RE: Trails - Canard - 03-13-2018 Would love to see a drawing. RE: Trails - danbrotherston - 03-14-2018 Best document I could find of the promenade is this. http://www.waterloo.ca/en/contentresources/resources/government/07-14-2016_Design-Brief_FunctDesCentProm_Section2_AODA.pdf But it leaves the boardwalk on the west side mostly dotted lines. I didn't even expect it to be built in this phase. I wonder what happened. RE: Trails - Pheidippides - 03-14-2018 This seems to show it: This article mentions it. Although the council report says that connection is for the future: "This connection feeds in to the Central Promenade, and will facilitate circulation in an east-west direction along the interior perimeter walkway when a trail is installed west of the corridor in the future." They probably could afford to connect the dots because of the money they saved from cancelling the glow in the dark trail (Sorry Canard for mentioning that old wound). RE: Trails - Canard - 03-14-2018 Thanks for the diagram! So it looks like it’s just a little wooden ramp, to get the grades to line up (huge hill right now), not a big elaborate boardwalk or anything. John mentioned the bridge had to be moved 1.2 m due to utilities... that seems like a fairly big deal. I hope that doesn’t delay the project more than a few weeks, but that sounds like a “months” kind of problem to me, based on how fast these kinds of things seem to move for the Region... RE: Trails - ijmorlan - 03-14-2018 (03-14-2018, 09:15 PM)Canard Wrote: They should still be able to finish the rest of the path and open it. The new bridge will be a welcome capacity improvement, but the existing bridge can take the traffic until it is complete. The schedule was always a fantasy anyway — they were supposed to lift the bridge in place using a big crane in January, and finish the whole project tomorrow, which might have been possible if winter hadn’t happened. RE: Trails - Canard - 03-14-2018 I wonder what it’s like to work in an industry where you can just blow your timeline by like 3 months and nobody flinches. RE: Trails - Pheidippides - 03-15-2018 Apparently the funding for the boardwalk came from the region (page 96): Funding – 2017 REGION (180,000) Boardwalk I guess that means the western trail won't be maintained in the winter since that boardwalk structure won't support a sidewalk snow plough? Is there a reason they went with a boardwalk instead of a more permanent earth berm to change the grade? Is it because it is on the flood plain? Seems like a wooden structure won't las very long. I think I recall that some of the funding from this project came from some special one-time provincial and/or federal funding that had to be spent by March 31, 2018 and that only 40% of the funding could be deferred to April 1, 2018 to March 31, 2019. RE: Trails - danbrotherston - 03-15-2018 @Pheidippides I think you're right the boardwalk is usually used when you want a low impact on the environment. It will last a long time though, it's not a fully wooden structure. It's got metal piers, and is designed for this application. RE: Trails - Canard - 03-15-2018 RE: Trails - nms - 03-16-2018 Which bridge needed to move for utility work? If I recall correctly, the former trail bridge was in one alignment (A) and the newer bridge was shifted slightly east or west to a new alignment (B). Based on diagram above, it would appear that there will now be two bridges at A and B. Either way, I'm sure that they were surprised to find utilities in the way. RE: Trails - Canard - 03-16-2018 My understanding is that they moved it 1.2 m from where they were planning on putting it originally. |