Vive is proposing a new three tower development at the corner of Bridgeport and Lancaster just down the street from their existing Lancaster project. The properties involved are 585 Bridgeport, 518 Lancaster and 514 Lancaster. It's across Bridgeport from the Tim Hortons and next to the Shell.
Overall the towers proposed are 34 36, and 40 floors, ontop of a 6 floor podium. The site will contain 1165 units, split between 1 bdrm, 2 bdrm, and 1 bdrm + den configurations.
The proposed development will have an FSR of 13.0, many projects within the downtown core aren't hitting that. The site plans to have a parking ratio of 0.86 spaces per unit and 0.07 visitor spaces per unit.
Nothing beyond that is public at this point but additional information will be public in the coming weeks.
Posts: 6,718
Threads: 38
Joined: Aug 2014
Reputation:
118
Community response will likely urge lower density, more parking, and some 3 bedroom units. My prediction.
By the way, three towers on one podium or each tower with its own podium? Huge project either way.
Posts: 979
Threads: 35
Joined: Apr 2019
Reputation:
268
(08-18-2026, 07:45 PM)panamaniac Wrote: Community response will likely urge lower density, more parking, and some 3 bedroom units. My prediction.
By the way, three towers on one podium or each tower with its own podium? Huge project either way.
The community may be upset with it but Vive has their other project just down Lancaster with similar heights closer to existing low rise residential. Thus they have precedent for something of this scale. Now one could argue it is a bad location given the relative isolation with respect to the rest of the city but it is certainly a interesting node developing if everything goes ahead that is planned.
Given the site size I would guess that it's going to be separate podiums (2.82 acres), a typical tower size is 750sqm to 1000sqm which even taking the larger floor plate is still under an acre in size for all 3 towers. The only way I could see it being on one is if Vive is protecting for some future phase down the road but I would expect some surface parking.
Posts: 2,121
Threads: 18
Joined: Aug 2014
Reputation:
64
(08-18-2026, 07:45 PM)panamaniac Wrote: Community response will likely urge lower density, more parking, and some 3 bedroom units. My prediction.
By the way, three towers on one podium or each tower with its own podium? Huge project either way.
I used to bike by that corner all the time (which was a terrible ride). Parking kind of is an issue, especially since it's not like that area has any walkscore at all. 3br units would also be useful...
That is indeed a lot of units.
Posts: 956
Threads: 13
Joined: Oct 2015
Reputation:
96
Since this is a Vive project, I expect the buildings to be Precast concrete with no thought to the overall design on top of a 5 story grey, black and white precast parking garage podium. Aka Hideous. which is too bad because the building across the street from this are precast, but look nice.
I guess i will wait until more information is public, but I do not have high hopes for this.
Posts: 10,912
Threads: 67
Joined: Sep 2014
Reputation:
396
(08-18-2026, 10:24 PM)ZEBuilder Wrote: Given the site size I would guess that it's going to be separate podiums (2.82 acres), a typical tower size is 750sqm to 1000sqm which even taking the larger floor plate is still under an acre in size for all 3 towers. The only way I could see it being on one is if Vive is protecting for some future phase down the road but I would expect some surface parking.
An acre is about 4000 m2, so 11,000 m2 (1.1 hectares) with 2,250-3,000 m2 of that covered by podiums? Mixing SI and imperial units drives me crazy. 🤪
Posts: 979
Threads: 35
Joined: Apr 2019
Reputation:
268
(08-20-2026, 08:24 AM)westwardloo Wrote: Since this is a Vive project, I expect the buildings to be Precast concrete with no thought to the overall design on top of a 5 story grey, black and white precast parking garage podium. Aka Hideous. which is too bad because the building across the street from this are precast, but look nice.
I guess i will wait until more information is public, but I do not have high hopes for this.
Precast like any material has its practical limit, generally you'll see precast buildings top out around 25 floors. It's certainly possible to use precast taller than that but it becomes more difficult to do so. Often you'll start to require cast in place elements so the benefits of precast start to go out the window.
You may see this built as CIP with precast wall panels as the external cladding which is more common in taller buildings and can still look pretty good.
Posts: 956
Threads: 13
Joined: Oct 2015
Reputation:
96
(08-20-2026, 06:53 PM)ZEBuilder Wrote: (08-20-2026, 08:24 AM)westwardloo Wrote: Since this is a Vive project, I expect the buildings to be Precast concrete with no thought to the overall design on top of a 5 story grey, black and white precast parking garage podium. Aka Hideous. which is too bad because the building across the street from this are precast, but look nice.
I guess i will wait until more information is public, but I do not have high hopes for this.
Precast like any material has its practical limit, generally you'll see precast buildings top out around 25 floors. It's certainly possible to use precast taller than that but it becomes more difficult to do so. Often you'll start to require cast in place elements so the benefits of precast start to go out the window.
You may see this built as CIP with precast wall panels as the external cladding which is more common in taller buildings and can still look pretty good.
I agree that precast panels done right can look great, If and this is an important if. They hire a professional Architect that cares about aesthetics not just making money. Unfortunately I have seen very few Stubbe precast buildings that look good. I believe Vive uses Stubbe's for most of their recent builds.
Posts: 1,224
Threads: 0
Joined: Mar 2015
Reputation:
40
(08-18-2026, 10:24 PM)ZEBuilder Wrote: The community may be upset with it but Vive has their other project just down Lancaster with similar heights closer to existing low rise residential. Thus they have precedent for something of this scale. Now one could argue it is a bad location given the relative isolation with respect to the rest of the city but it is certainly a interesting node developing if everything goes ahead that is planned.
Where is there a 40 story tower on Lancaster?
Posts: 979
Threads: 35
Joined: Apr 2019
Reputation:
268
(08-25-2026, 09:14 AM)timc Wrote: (08-18-2026, 10:24 PM)ZEBuilder Wrote: The community may be upset with it but Vive has their other project just down Lancaster with similar heights closer to existing low rise residential. Thus they have precedent for something of this scale. Now one could argue it is a bad location given the relative isolation with respect to the rest of the city but it is certainly a interesting node developing if everything goes ahead that is planned.
Where is there a 40 story tower on Lancaster?
It's not yet built but Vive (as part of a JV with Corley) has gotten the 528 Lancaster project approved at the ZBA/OPA stage. That project went through three different iterations the last being 5 buildings ranging from 10 to 34 floors. With the first building constructed at 8 floors but because it got approved at a greater density one could move it to another building.
Hence there's precedent for buildings this tall in the area, 34 and 36 aren't audacious asks with the 528 project being closer to the existing low rise residential. 40 while being taller isn't much of an ask when it is further from the low rise.
Posts: 10,912
Threads: 67
Joined: Sep 2014
Reputation:
396
(08-21-2026, 08:11 AM)westwardloo Wrote: I agree that precast panels done right can look great, If and this is an important if. They hire a professional Architect that cares about aesthetics not just making money. Unfortunately I have seen very few Stubbe precast buildings that look good. I believe Vive uses Stubbe's for most of their recent builds.
I don't think Stubbe's is at fault here, it's the developers that spec the precast panels that make those look good--or not. Stubbe's can deliver either nice panels or the most boring stugg ever conceived.
Posts: 979
Threads: 35
Joined: Apr 2019
Reputation:
268
This one is now public. It will be a 3 phase project if and when it gets built. There is one level of underground parking, along with 6 floors in the podium, there is no retail on site, there certainly should be something.
The architect is Reinders + Law which is standard for a Vive building, however they tried something different with the design, do with that what you will.
Documents for it can be found here: ZBA/OPA Documents[url=https://app2.kitchener.ca/AppDocs/OpenData/AMANDADataSets/Supporting_Documents_List_790354.pdf][/url]
Site Plan:
Render:
Posts: 1,638
Threads: 9
Joined: Sep 2014
Reputation:
62
I happened to be riding along the Iron Horse Trail today and noticed that many of the older apartment buildings had underground parking. I also know of developments like the "Village on the Green" on University Ave E in Waterloo has underground parking. What changed that allowed developers to insist that they should not have to pay for underground parking? Were City Councils stronger in the 1970s and 1980s?
Posts: 979
Threads: 35
Joined: Apr 2019
Reputation:
268
(11-02-2026, 08:42 PM)nms Wrote: I happened to be riding along the Iron Horse Trail today and noticed that many of the older apartment buildings had underground parking. I also know of developments like the "Village on the Green" on University Ave E in Waterloo has underground parking. What changed that allowed developers to insist that they should not have to pay for underground parking? Were City Councils stronger in the 1970s and 1980s?
There really isn't a simple catch all answer to this but it generally comes down to a change in how we build towers coupled with greater densities forcing additional parking because of our zoning requirements. I explain this below but the TLDR is going underground now costs a pretty penny compared to before given smaller sites and larger parking requirements, going above grade is cheaper so developers do it. We can control it through zoning if we really want to but that requires a council that has the spine to do that.
If you think about towers that were built years ago around KW they tend to be "tower in the park" typologies around 10-15 floors. When you have a tower in the park type concept you are on a property with a large amount of space. Generally you are able to accommodate whatever your parking requirement is on a singular underground floor (coupled with surface parking). The benefit of that is really two fold, you don't require a deep excavation for underground parking, and you can get away without a shoring system (in some cases), both of which means it is cheaper to build.
Now when you compare that to new infill apartment buildings which go on smaller lots, tend to be taller, have more units, and more parking (given the parking requirements in zoning) you get the root of the problem. You either build above ground or go deeper to accommodate all the parking in a smaller area. However going deep costs way more then building up for a variety of reasons. The first cost is a shoring system which you may not have needed in an older building. In places like Mississauga or Toronto you can have a deep foundation with relative ease since you hit bedrock fairly shallow meaning a shoring system isn't excessively complex although excavation gets annoying dealing with the expansive bedrock. In KW where bedrock is significantly deeper your shoring system gets more complex as you have to deal with much larger earth pressures and may require additional tiebacks, rakers, and may get into a caissons vs solider pile and lagging debate depending on the site specific conditions.
The next cost with going deep which can be an issue anywhere but is especially true given the hydrogeological makeup of KW is water. The aquifers of KW mean excavations at depth tend to require a dewatering system which is often avoid by staying shallow. Not to mention foundations within the water table tend to be more complex as you have to deal with hydrostatic pressure instead of just standard earth pressures which depending on the exact situation may require deep foundations (caissons/CFA) and a raft slab instead of just a raft slab. The best local example of this exact issue was 599 and 595 Strasburg Rd, 595 had two floors of underground parking which required a continuous dewatering system, but 599 was only one floor underground and didn't require a dewatering system. Now take an area which has a large amount of clay (Downtown Toronto) water barely moves in a day (0.00000864 m/day), but in an area with sand and gravel mixes (KWs aquifers) water can move large distances (86.4 m/day). It certainly isn't impossible to deal with but it drives the cost up, those are also pretty standard permeability assumptions for the soil types but can still vary significantly and are entirely site specific (part of why geotech is a fascinating world).
Obviously you can force underground parking by outright banning above ground parking which has been done elsewhere but a simple compromise is what Kitchener did with the priority streets which force an active street frontage (units/retail/community space) instead of a wall of podium level parking.
Posts: 956
Threads: 13
Joined: Oct 2015
Reputation:
96
(11-02-2026, 04:39 PM)ZEBuilder Wrote: This one is now public. It will be a 3 phase project if and when it gets built. There is one level of underground parking, along with 6 floors in the podium, there is no retail on site, there certainly should be something.
The architect is Reinders + Law which is standard for a Vive building, however they tried something different with the design, do with that what you will.
Documents for it can be found here: ZBA/OPA Documents[url=https://app2.kitchener.ca/AppDocs/OpenData/AMANDADataSets/Supporting_Documents_List_790354.pdf][/url]
Site Plan:
Render:
Not great not bad. Definitely a step in the right direction from what Vive has produced the past couple projects. One easy thing that would make these better, the tower "A" and "B" should be a consistent colour. Not sure why they have the first 12ish floors the same colour as Tower "c". If each tower was a consistent different colour this development would look pretty nice.
|