11-07-2026, 07:06 PM
(10-22-2026, 03:22 PM)KingandWeber Wrote: I'm not sure how much there is to do. There's a huge chill on development overall right now to the point I'm not sure there's even one project underway/close to construction in the Region that I'm excited about.
(10-23-2026, 12:31 AM)ZEBuilder Wrote: While there may not be interesting stuff happening there is still a substantial amount of development happening. There really just isn't many cranes up compared to the past. I know I've got a summers worth of drone photos for pretty much all of KWCs projects both big and small. I just haven't had the time to go through and post them yet.
In terms of mid to highrise developments you have the following under construction in Kitchener:
- 249 West Oak Trail (topped out)
- Franklin Flats (4th building is topped out)
- Stride on Franklin (few floors before top out)
- Weber Yards (Tower C is being built with B following)
- 3241 King Phase 2 (Half way up)
- 25 Sportsworld Crossing Tower A (topped out)
- 1295 Bleams (topped out)
- Metz Tower A-C (B and C are topped out)
- 63 Courtland (topped out)
- Knossos Duke St (topped out)
- Eureka (topped out, occupancy should be soon)
- 864 King Tower A (21 of 45)
- Station 8 and Affordable Housing (site prep)
Also Friendship Village (House of Friendship project on Charles St E).
For me, the combination of Knossos, Friendship Village and the fire station projects is pretty exciting as it brings a substantial amount of affordable housing to DTK.

