(03-23-2022, 04:23 PM)cherrypark Wrote: New information about the Stewart St and Joseph St MUTs reconstruction is on EngageWR now, including the drawings package.
Nothing particularly new, though I am glad to see that the MUT transition into the intersection at Victoria and through to the bike path is going to be properly graded down instead of the pedestrian curb cut and slopes like every wrist-breaking intersection on the Victoria St E MUT.
I didn't realize Stewart was getting a MUT as well, that's good. I hope it all connects well, especially the Victoria St crossing. It will be great to finally be able to bypass Victoria Park to get to the IHT from downtown.
I still don't understand the transition between Waverly and Cherry Park at all, but I can tolerate it...