06-15-2017, 09:07 PM
Wasn't sure where to post this.
I had not been in Waterloo Park for a while and was surprised tonight to see how much progress had been made on the reconfiguration of the circulation routes within the park over by the central entrance.
The picture below is looking (west) up the road along the tennis courts the new trail is seen on the left. It winds its way up the hill and crosses the road and connects to the trail that runs alongside the tennis bubble.
And looking to the east (back toward Albert) the road no longer goes straight through (but the trail does) while the road curves into the parking lot (no longer dirt but paved):
I had not been in Waterloo Park for a while and was surprised tonight to see how much progress had been made on the reconfiguration of the circulation routes within the park over by the central entrance.
The picture below is looking (west) up the road along the tennis courts the new trail is seen on the left. It winds its way up the hill and crosses the road and connects to the trail that runs alongside the tennis bubble.
And looking to the east (back toward Albert) the road no longer goes straight through (but the trail does) while the road curves into the parking lot (no longer dirt but paved):
Everyone move to the back of the bus and we all get home faster.