Any time frame on this recent work? Yeah the southbound collector has basically lost a lane (Wellington exit ramp lane not clearly marked and dodgy at best). Tried Lancaster a couple times today and it's a toss-up.
The retaining wall work by the Saab dealership (Victoria) seems substantial, driving piles all day, not sure purpose for footings or part of the overpass work
Posts: 2,003
Threads: 7
Joined: Sep 2014
Reputation:
124
I think I read somewhere (City of Kitchener site maybe?) that the Victoria/Frederick interchange is supposed to be closed until October. I suspect as part of the interchange reconfiguration, the exit lane for Victoria is going to have to be shifted further west in order to make room for the on-ramps from Hwy 7. There wasn't enough space to do that without the substantial work they're doing now.
Posts: 1,935
Threads: 102
Joined: Aug 2014
Reputation:
18
Work on this project is really ramping up. The southbound collector Lane closure began early this week and it's already heavily under construction.
Posts: 116
Threads: 0
Joined: Sep 2016
Reputation:
4
Originally put this in the general road construction thread.
Wondering if the current 3-way stop at Riverbend/Wellington/Shirley will have the traffic lights turned on soon. There were signs laying on the ground today in each direction showing "Traffic Light" and "NEW" just waiting to be propped up.
Posts: 1,095
Threads: 3
Joined: Aug 2015
Reputation:
58
The Wellington / Bingemans extension is completely paved and has lane markings for 2 lanes now - I think traffic could shift to the new lanes by the end of the week, and then construction could start on the existing 2 lanes
Posts: 281
Threads: 0
Joined: Jul 2016
Reputation:
31
Does anyone know if that's coupled with using the new extension?
Posts: 141
Threads: 2
Joined: Sep 2014
Reputation:
2
As of 8:00pm I can confirm that the lights are not yet activated nor is the extension open. It looks like it would be ready to open any day however.
Posts: 2,003
Threads: 7
Joined: Sep 2014
Reputation:
124
I can report that the Shirley extension is open as of this evening. Still just two lanes, of course, but what an improvement!
Posts: 116
Threads: 0
Joined: Sep 2016
Reputation:
4
I wish the left turn advance from Wellington to Riverbend was a little longer. That has been my regular morning route and it seems like it take 2-3 lights to get through this week. Maybe it is a perception thing that when it was a 3-way stop you are always crawling along. I understand the whole area is still a work in progress.