Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 16 Vote(s) - 4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
Regarding the "special gauge", the trains will have a narrower loading gauge than freight trains, right? Is it possible he thinks a wide loading gauge would allow for more space inside? That certainly sounds reasonable to me.

Or he might just be clueless.
Reply


Our trains have standard gauge, with no deviation. This allows freight trains to share the track on the Waterloo Spur with few issues.
Reply
...more importantly, there was just simply no reason to pick a non-standard gauge.
Reply
(10-27-2017, 07:11 PM)jwilliamson Wrote: Regarding the "special gauge", the trains will have a narrower loading gauge than freight trains, right?  Is it possible he thinks a wide loading gauge would allow for more space inside? That certainly sounds reasonable to me.

Or he might just be clueless.

I’m pretty sure he doesn’t understand the difference between loading gauge, track gauge, wire gauge, and shotgun gauge. But I think you’re right that the LRV loading gauge is smaller than a typical freight loading gauge. That’s why gauntlet track is needed at the stations.
Reply
The gauntlet track is needed at stations to allow the freight trains to have clearance from the platform edges. ION uses standard gauge. The TTC, on the other hand, does use a wider gauge on its streetcar and subway network; perhaps he mistakenly believes it's the standard?
Reply
He's been at it since day one.

https://www.therecord.com/opinion-story/...is-biased/
Reply
(10-28-2017, 02:00 AM)jamincan Wrote: The gauntlet track is needed at stations to allow the freight trains to have clearance from the platform edges. ION uses standard gauge. The TTC, on the other hand, does use a wider gauge on its streetcar and subway network; perhaps he mistakenly believes it's the standard?

That’s what I said — ION has a smaller loading gauge than freight. The track gauge is of course standard gauge, same as freight.

As to his understanding of the gauge, I’d like to see what would happen if you first engaged him in a discussion of what the rail gauges were, then kidnapped him and forced him to stand in the Waterloo Town Square parking lot where the freight and LRT lines are connected together with a switch. Then force him to count the seats on a bus and on an LRV, and also measure the size of seats on a bus, LRV, and Calgary LRV.

The cognitive dissonance would probably be fatal.
Reply


Interesting article about Denver’s extensions:

http://www.denverpost.com/2017/10/26/rtd...ommission/

I had no idea they were having so many technical issues with crossings. 18 months of delay because of crossing arms is alarming. I wonder how much testing, timing and signing-off will need to be done here - especially since our system is the first modern LRT system in Canada?
Reply
Their problems seem to relate to an unproven wireless technology on their signals. To my knowledge ours use tried-and-true wired systems, yes?
Reply
No idea. Could be!
Reply
1/2 - Sunday, October 29, 2017

A couple of notes from today;
  • Chain link fence has gone up on Hayward, between the sidewalk and the tracks.  I think this is a requirement here because Transport Canada says its a "railway" and not Light Rail, because of the ballasted tracks and so on (and ATC, I suppose).  Very unfortunate, as it's hideous and makes me want to die.
  • Fences are coming to Block Line, too - the posts are all up at the North side of the station.
  • The little orange light was blinking at Borden station today, on the OCS pole!  Does that mean the power is on?  It was blinking on for about 0.1 second, off for about 0.6-0.7 seconds (ie, a littel faster than 1 Hz, maybe 1.4 Hz or so).

   
Driver's Facilities deficiency work seems to be complete at Fairway.

   
Love that logo!

   
I hadn't expected to see the landscaping completed, here - isn't this where the two giant birds are going?  Or is this a case of "we have to let GrandLinq finish off their thing as per the Project Agreement, before we come in and change stuff"?
Reply
2/2 - Sunday, October 29, 2017

   
Another shipment from Germany!

   

   
I hadn't really thought about it until today, but the design at the end of the tracks is totally different here from Conestoga.

At Conestoga, the tracks end at a giant "D"-shaped concrete flowerbed, which I had always assumed was sort of a "last resort" crash protection in case a train overran the bumping posts. Here, there's nothing like that - the bumping posts would just push right off the end of the rails. It's also interesting that the platform concrete slopes down flush with the track here, which means people are going to cut across the ends of the tracks, instead of walking around.

   
I love you so much, DIN 1451.  I love you so much that I spec you on all the Lamacoids on the machinery I design!
Reply
(10-29-2017, 04:44 PM)Canard Wrote: 1/2 - Sunday, October 29, 2017

A couple of notes from today;
  • Chain link fence has gone up on Hayward, between the sidewalk and the tracks.  I think this is a requirement here because Transport Canada says its a "railway" and not Light Rail, because of the ballasted tracks and so on (and ATC, I suppose).  Very unfortunate, as it's hideous and makes me want to die.
  • Fences are coming to Block Line, too - the posts are all up at the North side of the station.
  • The little orange light was blinking at Borden station today, on the OCS pole!  Does that mean the power is on?  It was blinking on for about 0.1 second, off for about 0.6-0.7 seconds (ie, a littel faster than 1 Hz, maybe 1.4 Hz or so).

By fences at Block Line, do you mean near the Block Line station?

Also Hayward is weird — although they put in fences, last time I drove by (yesterday), I thought I saw that the parking lot entrances still have no crossing arms. So fences are “needed”, but not any sort of crossing protection? How does that make sense? Especially since just up the road at the intersection with Courtland there are crossing arms on the pedestrian crossing, the same one that connects to the sidewalk that is separated from the tracks by a fence.

Interesting news about the blinking light. I’ll have to take a look for similar lights up here in Waterloo.
Reply


(10-29-2017, 04:47 PM)Canard Wrote: I hadn't really thought about it until today, but the design at the end of the tracks is totally different here from Conestoga.

At Conestoga, the tracks end at a giant "D"-shaped concrete flowerbed, which I had always assumed was sort of a "last resort" crash protection in case a train overran the bumping posts. Here, there's nothing like that - the bumping posts would just push right off the end of the rails. It's also interesting that the platform concrete slopes down flush with the track here, which means people are going to cut across the ends of the tracks, instead of walking around.


I love you so much, DIN 1451.  I love you so much that I spec you on all the Lamacoids on the machinery I design![/i]

I guess they want to be ready for Phase 2. Nothing to remove in order to construct the extension.

Although at Conestoga, it’s easy to imagine a future expansion back down King St. to Uptown, so I’m not sure I would have put something across the end of the tracks that would require removal when expanding the system.

Gold Coast did something interesting: at one end of the initial phase, as far as I can tell from video footage, they built both tracks through the station area, but then built a platform on top of one of the tracks so that the train can open doors on both sides for as long as it is a terminal. It looks as if they just poured concrete on top of the embedded tracks but I assume they put down a layer of something to allow the platform to be smoothly removed when the extension is opened.
Reply
(10-29-2017, 04:44 PM)Canard Wrote: 1/2 - Sunday, October 29, 2017

A couple of notes from today;
  • The little orange light was blinking at Borden station today, on the OCS pole!  Does that mean the power is on?  It was blinking on for about 0.1 second, off for about 0.6-0.7 seconds (ie, a little faster than 1 Hz, maybe 1.4 Hz or so).


It probably does mean that. Though it would be a more useful indicator if it was a solid light or a frequently blinking one rather than 0.1 seconds on 0.6-0.7 seconds off.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 23 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links