In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 16 Vote(s) - 4 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
A few tweets from Tom hinting at future developments along the line:

https://twitter.com/tomjgalloway14/statu...5505490944

https://twitter.com/tomjgalloway14/statu...7813859328
Reply


(11-13-2018, 02:44 PM)Lens Wrote: A few tweets from Tom hinting at future developments along the line:

https://twitter.com/tomjgalloway14/statu...5505490944

https://twitter.com/tomjgalloway14/statu...7813859328

The old lumber yard adjacent to the Mill Station would be a prime site for redevelopment, istm, as would the Ernst Landscaping property down Mill St.

I assume Galloway's reference at Borden Stn would be to the Ottawa/King/Borden/Charles block.
Reply
Wow, lucky Tom! Must have been quite exciting to go for a ride along the entire length of the system.

I'm a little concerned by the time it took, though. Based on the timing of the twitter posts, it appears the round trip took 2.5 hours...

   
Reply
A Record story said that Vive was assembling the Ottawa-Charles-Borden-King block, so the Perimeter block is likely from Borden to Sterling/Kent, Charles, and likely the King side, but possibly the towards-Courtland side.
Reply
(11-13-2018, 04:36 PM)Viewfromthe42 Wrote: A Record story said that Vive was assembling the Ottawa-Charles-Borden-King block, so the Perimeter block is likely from Borden to Sterling/Kent, Charles, and likely the King side, but possibly the towards-Courtland side.

The more the merrier in that part of town.
Reply
(11-13-2018, 04:24 PM)UrbanCanoe Wrote: Wow, lucky Tom! Must have been quite exciting to go for a ride along the entire length of the system.

I'm a little concerned by the time it took, though. Based on the timing of the twitter posts, it appears the round trip took 2.5 hours...

I wouldn't be too concerned about it when they were using a vehicle without all the FIE. Next time someone takes a round trip in a train that has the FIE the round trip will be much shorter. The train Tom was in still had to stop for inductive loops to activate signals.
Reply
East end properties are probably still fairly cheap compared to DTK prices
Reply


(11-13-2018, 05:56 PM)trainspotter139 Wrote:
(11-13-2018, 04:24 PM)UrbanCanoe Wrote: Wow, lucky Tom! Must have been quite exciting to go for a ride along the entire length of the system.

I'm a little concerned by the time it took, though. Based on the timing of the twitter posts, it appears the round trip took 2.5 hours...

I wouldn't be too concerned about it when they were using a vehicle without all the FIE. Next time someone takes a round trip in a train that has the FIE the round trip will be much shorter. The train Tom was in still had to stop for inductive loops to activate signals.

Plus it seemed like he was getting out from time to time.  Who knows how long they were stopped for.
Reply
Chris Klein and Markster did an analysis and posted it on the Facebook group claiming the end-to-end time was actually very close to the initial estimates.

As they couldn’t run at full 70 km/h along the 3 Spur sections, this only means the travel time should get even better.

Close to an hour to go 19 km/h is not good.
Reply
(11-13-2018, 10:11 PM)Canard Wrote: Chris Klein and Markster did an analysis and posted it on the Facebook group claiming the end-to-end time was actually very close to the initial estimates.

As they couldn’t run at full 70 km/h along the 3 Spur sections, this only means the travel time should get even better.

Close to an hour to go 19 km is not good.

FTFY
Reply
(11-13-2018, 10:11 PM)Canard Wrote: Chris Klein and Markster did an analysis and posted it on the Facebook group claiming the end-to-end time was actually very close to the initial estimates.

As they couldn’t run at full 70 km/h along the 3 Spur sections, this only means the travel time should get even better.

Close to an hour to go 19 km/h is not good.

What was the time supposed to be? I can't recall, but I thought it was 45 minutes end to end.
Reply
Heard on the radio: 512 doing pre-departure procedures.

Update (9:05 AM): 512 is now leaving the yard
Reply
“What will rapid transit travel times be?
Approximately 46 minutes from Conestoga to Fairview Park Mall for light rail transit and approximately 40 minutes from Fairview Park mall to Ainslie Street terminal with bus rapid transit.”
http://rapidtransit.regionofwaterloo.ca/...ons.asp#dd
Reply


Another train being delivered was at the Lancaster yard this morning getting shunted around.
Reply
I am surprised that Keolis is only hiring a communications specialist now. Perhaps signalling a new phase of the project?
Everyone move to the back of the bus and we all get home faster.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 190 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links