11-07-2022, 02:51 PM
(11-07-2022, 02:40 PM)ac3r Wrote: Because it looks and functions like shit. It turns buildings into even more ephemeral commodities and is an insult to the history of architecture and engineering.
In what way? How does it matter how the concrete got in place? Does this apply to all pre-cast? Floor panels (double-T or hollow)? Staircase segments?
I’m actually interested in your opinions as a professional in the field, but expressed this way it just looks like Luddism and is profoundly uninteresting.

