06-07-2023, 08:42 AM
(06-07-2023, 03:10 AM)taylortbb Wrote:(06-06-2023, 10:19 PM)CP42 Wrote: That’s interesting - a friend of mine lives in Charlie West which is a Momentum building and they do a whole building switchover as well. I believe a friend of mine who lives at Garment St Condos said they had to wait for a certain date to use their air conditioning as well.
That's not correct. I live in Charlie West and I'm 100% certain it's a 4 pipe system (separate heating and cooling loops). I was on the roof of Charlie West talking to their construction manager when I had that conversation. I'm on the south side of the building and was using my AC in March.
Garment St uses water source heat pump. A different system than CW, but also allows per-unit control. There's no reason you couldn't run AC in February at Garment St.
I guess my friends are confused, haha

