08-10-2023, 01:04 PM
(08-10-2023, 09:25 AM)SF22 Wrote: There is a new application for this site from April/May 2023. Looks like they've really redesigned the whole layout, including a new Central Park-style parkspace (park surrounded by tall buildings). Honestly, it looks a lot more logically laid out now. Pedestrian bridge is still being proposed, so that's good. https://www.engagewr.ca/525-to-565-conestogo-rd-w
The pedestrian bridge now seems to connected to the wooded area of the ION OMSF, which is pretty far from the ION station. I don't really see the point of it as it's currently shown, seems like a bridge to nowhere that will never be used. They need to bridge to actually meaningfully connect to the ION station, without an extremely circuitous route.