08-17-2023, 07:34 PM
Based upon Zehr Groups Instagram (Project Manager for the project) the tower crane base for the first building was poured yesterday. Looking at the permits in the system Vive doesn't have any of the foundation permits yet but it appears these might be even taller then the 24, 23, 19 that was original proposed as one of the permits in application status is stating 28 floors for tower A instead of 24 that was originally approved.