05-27-2024, 10:22 AM
This Record piece indicates the ground conditions on the south side were trickier than anticipated, so more stabilization and more solid piling were needed. That added time and cost alongside supply chain issues.
|
Avalon Place Highway 7/8 Multi-Use Trail Crossing
|
|
05-27-2024, 10:22 AM
This Record piece indicates the ground conditions on the south side were trickier than anticipated, so more stabilization and more solid piling were needed. That added time and cost alongside supply chain issues.
|
|
« Next Oldest | Next Newest »
|