(08-23-2024, 01:51 AM)Square Wrote:(08-22-2024, 10:44 PM)ZEBuilder Wrote: Vive has now submitted the first ZBA of for this project, since Vive is phasing this project each phase is going to get a different ZBA. The first phase is going to be the 44 floor building marked as Tower A on the original picture I posted. The building itself looks almost like 1001 King St S just taller and different colours so presumably this might be precast, it really has that feel.
The building will contain 455 units, of which 304 are 1 bedroom and 151 are 2 bedroom. The building will also contain 261 parking spaces, contained in the podium and 2 floors of underground parking, due to this being set back from the road the parking podium looks hideous in the renders but there is hope for a future building to block it.
In the posted documents there are floor plans for each proposed unit, the smallest unit is a 1brdm at 544 sqft and the largest is a 2brdm unit at 847sqft.
Docs:
Phase 1 Docs
Phase 1 Floor Plans
Phase 1 Urban Design Brief
Renders:
Podium viewed from King St:
Tower viewed from the park behind the site:
So is the 38 storey building now 44 storey and only 3 buildings being 55, 44, and 16 stories?
In all likelihood Vive is still going to do all 4 of the buildings they are just are going for taller versions, the way the 44 floor tower is designed still allows for the other buildings to be as tall as they were planning without requiring extensive ZBAs, but Vive might just want to go taller.