11-26-2024, 11:05 PM
Since they mobilized they have installed various new pieces of underground infrastructure, they have installed new storm sewer throughout the site, they have watermain sitting on site as well as more manholes, from the looks of the manholes left it's for more storm infrastructure since most of them say CBMH (Catch Basin Manhole).
They have also started the demolition of the MC/DC bridge and MC/DC to M3 bridge connection. Cladding was taken off slowly over the last week next to DC as well as the underside of the M3 bridge.