03-23-2025, 12:41 PM
(03-14-2025, 07:32 AM)CuilTard Wrote:(03-13-2025, 11:58 PM)ijmorlan Wrote: It just occurred to me, it’s interesting that the parking is completely enclosed. That implies a massive ventilation system, rather than just having it sufficiently open. I wonder if it will be heated?
Enclosed on the Halls side at least. Will try to post the gaps on the other 3 sides today. We did see radiant floor heating pipes installed at one point #513
I was also wondering if all the trash pickup, etc. Is still in the podium like they promised the neighbourhood meeting way back. It seems like there are just up/down ramps inside the big doors on Halls/Charles?
Other 3 sides do indeed appear to be enclosed. There is a vent/grate above the big door on Halls, though.
![[Image: lqkCnEm.jpg]](https://i.imgur.com/lqkCnEm.jpg)
![[Image: eG23CfW.jpg]](https://i.imgur.com/eG23CfW.jpg)
![[Image: 6JFxPZv.jpg]](https://i.imgur.com/6JFxPZv.jpg)
![[Image: i7CuaWB.jpg]](https://i.imgur.com/i7CuaWB.jpg)

