04-24-2025, 07:11 PM
Here's the site with the crane, the crane that is up is way taller than required for an 8 floor building, generally when this happens its to allow a future crane (this will likely have three in total) to pass underneath so the jibs don't hit. The second cranes base is installed in the foundation, they're just waiting on concrete now.
March 24 2025
March 24 2025