04-25-2025, 08:29 AM
(04-24-2025, 07:11 PM)ZEBuilder Wrote: Here's the site with the crane, the crane that is up is way taller than required for an 8 floor building, generally when this happens its to allow a future crane (this will likely have three in total) to pass underneath so the jibs don't hit. The second cranes base is installed in the foundation, they're just waiting on concrete now.
March 24 2025
Cool. Although I think this project is filled with ugly looking buildings, it is neat to see a site with more than one (1) crane on it. Large scale developments in the GTA almost always have a couple cranes on site. I thought station park was going to have two (2) or three (3) cranes at a time, but they really stuck to the phased approach.

