06-06-2025, 10:24 AM
(06-06-2025, 09:53 AM)Gubs Wrote:(06-02-2025, 12:39 AM)Square Wrote: Has this one stalled? From Weber Street, looks like it has not grown since I last checked close up in January.
I live just down the street. No work on the site in the last 5-6 months. I put an inquiry into the local councillor asking if the project had died. No response.
There's a hold up at the above ground permit, I don't know what it is but it was submitted last year and is still has an application status. There is likely something behind the scenes, the city may have a backlog or there is some condition on the permit that is preventing issuance of the permit. The same thing is happening with the 3 above grade permits for buildings A, B and C at The Metz. Likewise the same thing is happening with 1001 King (Lower Kitchener).
All the permits with that issue are from the same time in terms of application dates, permits before then seem to have processed fine (1295 Bleams was before and has the permit). Developers don't like stopping construction so there is inevitably a permit issue with the above mentioned projects, or the city is that backed up which seems unlikely.