10-20-2025, 11:21 AM
(10-18-2025, 07:48 PM)ZEBuilder Wrote: For those interested the bid that the Region had for the partial demolition of the Rumpel Felt building has been cancelled. The bid was posted in early August with the intent being closure of the bid in September (I don't recall the exact date). However the bid kept getting extensions, the last extension required bids to be submitted by the 21st of October. However it was cancelled on Thursday or Friday of this week.
It would be to the surprise of no one if timelines have slipped on this now, considering they wanted to start work on the track and all the related infrastructure in March of next year, the Rumpel Felt building was intended to be partially demolished before then, if it goes through the normal bid process the building won't likely start demolition until next year at the earliest, but even then it all depends on how the Region intends on bidding for the project.
Besides construction timelines shifting, are bids extended if no bids have been received by the deadline?