10-21-2025, 11:18 AM
Schneider Creek trail another step closer to construction
Construction is expected to begin next year on the Kitchener’s Schneider Creek multi-use trail.
The Grand River Accessibility Advisory Committee is set to receive an update on the status of the trail Thursday, which has reached the property acquisition and detailed design stage, a prelude to construction.
The 1.3-kilometre asphalt route, between Manitou Drive and Block Line Road, will include a pedestrian/cycling bridge over the creek, rest stops and an at-grade railway crossing before joining with the existing Trans Canada Trail.
Construction is expected to begin next year on the Kitchener’s Schneider Creek multi-use trail.
The Grand River Accessibility Advisory Committee is set to receive an update on the status of the trail Thursday, which has reached the property acquisition and detailed design stage, a prelude to construction.
The 1.3-kilometre asphalt route, between Manitou Drive and Block Line Road, will include a pedestrian/cycling bridge over the creek, rest stops and an at-grade railway crossing before joining with the existing Trans Canada Trail.

