10-30-2025, 11:30 PM
The crane is now up for phase 2. This marks Vive's third high rise in some stage of construction (95 cumulative floors) the most they've ever had. They have this, 864 King (shoring), and 1001 King (a month or two until top out of phase 1, phase 2 is still to come).

