12-18-2025, 11:45 AM
There are a couple Ion-adjacent things in the funding - as former forum member Canardiain pointed out on Bluesky. https://bsky.app/profile/canardiain.bsky...a3asx7wc2c
To sum up, the pedestrian crossing behind Fairway will be upgraded to have full signals, and the path stub at the north end of R&T station will be finished to allow a through connection.
To sum up, the pedestrian crossing behind Fairway will be upgraded to have full signals, and the path stub at the north end of R&T station will be finished to allow a through connection.

