2026-06-03
They are working on the 7th and final floor for Building A. (The podium along Courtland for Building A is 5 stories. Building B will be the same.) Building B has been at 2 stories for a while, and Building C is at 3 stories. (To be 8 stories).
Edit: I was looking on the documents on the city's website and I found that there was a newer one switching which was Building A and which was Building B. Apparently, the one along Palmer is Building B and the one at Kent is Building A.
They are working on the 7th and final floor for Building A. (The podium along Courtland for Building A is 5 stories. Building B will be the same.) Building B has been at 2 stories for a while, and Building C is at 3 stories. (To be 8 stories).
Edit: I was looking on the documents on the city's website and I found that there was a newer one switching which was Building A and which was Building B. Apparently, the one along Palmer is Building B and the one at Kent is Building A.

