There's been another release of renderings and diagrams, including floor plans for both levels, bus platform maps, etc. Thanks to TriTAG for the discovery, via their week in review. https://pub-regionofwaterloo.escribemeet...ntId=17836
One notable addition from previous renderings, there's now a second tunnel under the platforms that leads right into the main hall. Previously access to the further platform was only via the tunnel that linked to the bus area, and it had no inside access from the station building. One downgrade however is that there is no longer a public door facing King St, all access is from the plaza on the Victoria St-facing side of the building. Oddly I can see there is a private corridor that leads to a door on that side, but unfortunately no access for the public.
One notable addition from previous renderings, there's now a second tunnel under the platforms that leads right into the main hall. Previously access to the further platform was only via the tunnel that linked to the bus area, and it had no inside access from the station building. One downgrade however is that there is no longer a public door facing King St, all access is from the plaza on the Victoria St-facing side of the building. Oddly I can see there is a private corridor that leads to a door on that side, but unfortunately no access for the public.

