02-09-2016, 08:26 PM
On the Spur Line, they've been pouring the upper layer of ballast on the second track. This upper ballast is about as far south as University Ave now. They still need to level and tamp the ties, and smooth out the ballast. No sign of any of that south of R&T Park station yet.