Final Design & Construction Report!
A Bunch of drawings to look through, I am exited for the changes this project will bring, even before the arrival of the highway itself!
It does not look like the Bruce extension will be part of this work unfortunately, however some pretty significant changes around the Wellington / Shirley exit.
http://guelph.ca/wp-content/uploads/Vict...Report.pdf
EDIT: Is the Bruce extension truly required at this point? Could one not use 85 to connect Victoria & Wellington with the bridge out?
A Bunch of drawings to look through, I am exited for the changes this project will bring, even before the arrival of the highway itself!
It does not look like the Bruce extension will be part of this work unfortunately, however some pretty significant changes around the Wellington / Shirley exit.
http://guelph.ca/wp-content/uploads/Vict...Report.pdf
EDIT: Is the Bruce extension truly required at this point? Could one not use 85 to connect Victoria & Wellington with the bridge out?