10-27-2014, 05:53 PM
(10-27-2014, 05:36 PM)JoeKW Wrote:Quote:This would be accomplished by relaxing standards for horizontal clearances and
accepting any related impact to operability of the trains under the bridge
Does that roughly mean that the trains would have to slow down a bit to go through it?
Kitchener bound trains would be slowing as they approach the Margaret Ave. bridge site because the old station is only <500 m away and the new station will be about 1 km from the bridge. The reverse is true leaving for the Toronto run. There are two signal regulated crossings between the bridge and the new station location and so a limited speed would be specified by GO or the federal transport regulator.
There are maximum speeds GO would consider appropriate in a station approach/leaving but I can't find them online.