06-25-2016, 10:35 AM
Lots of concrete ties await placement inside the OMSF yard.
While I was there, crews were stringing out the long lengths of ribbon rail, waiting to place them into final position.
Curves below a certain radius aren't just accommodated for on-site by bending ribbon rail, but rather, are pre-curved precisely with a roller bender, and welded together on-site. Here's a stack of those curved pieces.
Pulling the rails.