07-08-2016, 04:05 PM
Lots of work along Charles! Bit by bit, more concrete is showing up. The grounding wires have been encased in a couple of areas. Still just rails roughed in at Cameron Heights. Wonder what the deal is there.
Up at Columbia, the OCS is connected to the thick, high amperage supply wire now. The control box at R&T Park is getting wired as I type this.
Up at Columbia, the OCS is connected to the thick, high amperage supply wire now. The control box at R&T Park is getting wired as I type this.