07-21-2016, 10:11 AM
As a resident, that is the concern, yes.
The freight operator requires that the line be available every night; and only certain exemptions from CN (lots of fancy paperwork) will permit a multi-day shutdown (like what was done for the Culvert last summer).
The freight operator requires that the line be available every night; and only certain exemptions from CN (lots of fancy paperwork) will permit a multi-day shutdown (like what was done for the Culvert last summer).