08-10-2016, 09:50 AM
More things happening today on Charles and Ottawa!
Getting the last bit of embedded track ready for concrete at the Charles/Stirling intersection:
Only one section of the EB curve left to pour at the Charles/Borden intersection:
Curbing machine was here yesterday! E side of Ottawa now has curbs between Charles and (I think) Courtland:
And the bridge mystery is solved -- it will be a sidewalk (sorry, I was wrong in my earlier predictions), and the track will be next to it. (On the other side the sidewalk width is being cut back a bit due to the limited width of the bridge.)
Marker posts in place on N side of Ottawa for the curbing machine:
Getting the last bit of embedded track ready for concrete at the Charles/Stirling intersection:
Only one section of the EB curve left to pour at the Charles/Borden intersection:
Curbing machine was here yesterday! E side of Ottawa now has curbs between Charles and (I think) Courtland:
And the bridge mystery is solved -- it will be a sidewalk (sorry, I was wrong in my earlier predictions), and the track will be next to it. (On the other side the sidewalk width is being cut back a bit due to the limited width of the bridge.)
Marker posts in place on N side of Ottawa for the curbing machine: